Cargando…
RPC High Voltage Scan 2015
During the LS1 the CMS RPC system has been upgraded with 144 new chambers installed on the forth endcap stations. An annual HV (RPC efficiency vs HV) scan for the entire RPC system has been performed during the Run2 data taking period in 2015. The obtained results have been compared to the HV scans...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2156648 |
Ejemplares similares
-
RPC Performance Results for 2016
por: CMS Collaboration
Publicado: (2017) -
RPC Efficiency in early 2023 data
por: CMS Collaboration
Publicado: (2023) -
RPC Plots for Vienna Conference VCI
por: CMS Collaboration
Publicado: (2013) -
RPC Efficiency Results for Run-2
por: CMS Collaboration
Publicado: (2020) -
A high-voltage test for the ATLAS RPC qualification
por: Aielli, G, et al.
Publicado: (2004)