Cargando…

Electrical Power Budget for FCC-ee

We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, t...

Descripción completa

Detalles Bibliográficos
Autores principales: Aull, S., Benedikt, M., Bozzini, D., Brunner, O., Burnet, J.-P., Butterworth, A., Calaga, R., Jensen, E., Mertens, V., Milanese, A., Nonis, M., Oide, K., Schwerg, N., Tavian, L., Wenninger, J., Zimmermann, F., Rinolfi, L, Blondel, A., Koratzinos, M., Gorgi Zadeh, S.
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR024
http://cds.cern.ch/record/2156972
_version_ 1780950701305757696
author Aull, S.
Benedikt, M.
Bozzini, D.
Brunner, O.
Burnet, J.-P.
Butterworth, A.
Calaga, R.
Jensen, E.
Mertens, V.
Milanese, A.
Nonis, M.
Oide, K.
Schwerg, N.
Tavian, L.
Wenninger, J.
Zimmermann, F.
Rinolfi, L
Blondel, A.
Koratzinos, M.
Gorgi Zadeh, S.
author_facet Aull, S.
Benedikt, M.
Bozzini, D.
Brunner, O.
Burnet, J.-P.
Butterworth, A.
Calaga, R.
Jensen, E.
Mertens, V.
Milanese, A.
Nonis, M.
Oide, K.
Schwerg, N.
Tavian, L.
Wenninger, J.
Zimmermann, F.
Rinolfi, L
Blondel, A.
Koratzinos, M.
Gorgi Zadeh, S.
author_sort Aull, S.
collection CERN
description We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex.
format info:eu-repo/semantics/article
id cern-2156972
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling cern-21569722022-08-10T12:39:03Z doi:10.18429/JACoW-IPAC2016-THPOR024 http://cds.cern.ch/record/2156972 eng Aull, S. Benedikt, M. Bozzini, D. Brunner, O. Burnet, J.-P. Butterworth, A. Calaga, R. Jensen, E. Mertens, V. Milanese, A. Nonis, M. Oide, K. Schwerg, N. Tavian, L. Wenninger, J. Zimmermann, F. Rinolfi, L Blondel, A. Koratzinos, M. Gorgi Zadeh, S. Electrical Power Budget for FCC-ee Accelerators and Storage Rings 5: Extreme Beams (XBEAM) 5.2: Extreme colliders (XCOL) We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex. info:eu-repo/grantAgreement/EC/FP7/312453 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/2156972 2016
spellingShingle Accelerators and Storage Rings
5: Extreme Beams (XBEAM)
5.2: Extreme colliders (XCOL)
Aull, S.
Benedikt, M.
Bozzini, D.
Brunner, O.
Burnet, J.-P.
Butterworth, A.
Calaga, R.
Jensen, E.
Mertens, V.
Milanese, A.
Nonis, M.
Oide, K.
Schwerg, N.
Tavian, L.
Wenninger, J.
Zimmermann, F.
Rinolfi, L
Blondel, A.
Koratzinos, M.
Gorgi Zadeh, S.
Electrical Power Budget for FCC-ee
title Electrical Power Budget for FCC-ee
title_full Electrical Power Budget for FCC-ee
title_fullStr Electrical Power Budget for FCC-ee
title_full_unstemmed Electrical Power Budget for FCC-ee
title_short Electrical Power Budget for FCC-ee
title_sort electrical power budget for fcc-ee
topic Accelerators and Storage Rings
5: Extreme Beams (XBEAM)
5.2: Extreme colliders (XCOL)
url https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR024
http://cds.cern.ch/record/2156972
http://cds.cern.ch/record/2156972
work_keys_str_mv AT aulls electricalpowerbudgetforfccee
AT benediktm electricalpowerbudgetforfccee
AT bozzinid electricalpowerbudgetforfccee
AT brunnero electricalpowerbudgetforfccee
AT burnetjp electricalpowerbudgetforfccee
AT butterwortha electricalpowerbudgetforfccee
AT calagar electricalpowerbudgetforfccee
AT jensene electricalpowerbudgetforfccee
AT mertensv electricalpowerbudgetforfccee
AT milanesea electricalpowerbudgetforfccee
AT nonism electricalpowerbudgetforfccee
AT oidek electricalpowerbudgetforfccee
AT schwergn electricalpowerbudgetforfccee
AT tavianl electricalpowerbudgetforfccee
AT wenningerj electricalpowerbudgetforfccee
AT zimmermannf electricalpowerbudgetforfccee
AT rinolfil electricalpowerbudgetforfccee
AT blondela electricalpowerbudgetforfccee
AT koratzinosm electricalpowerbudgetforfccee
AT gorgizadehs electricalpowerbudgetforfccee