Cargando…
LHCb Upgraded RICH 1 Engineering Design Review Report
During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon det...
Autores principales: | Adinolfi, Marco, Kariuki, James Mwangi, Petridis, Konstantinos, Rademacker, Jonas, Garsed, Philip John, Wotton, Stephen, Cardinale, Roberta, Petrolini, Alessandro, Clark, David Edward, Egede, Ulrik, Mccann, Michael Andrew, Patel, Mitesh, Savidge, Trevor Edward, Websdale, David, Brock, Matthew, Harnew, Neville, Tacon, M, Benettoni, Massimo, Brummitt, Amanda Jayne, Easo, Sajan, Papanestis, Antonis, Ricciardi, Stefania, Wilson, Fergus, D'ambrosio, Carmelo, Frei, Christoph, He, jibo, Piedigrossi, Didier |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2158851 |
Ejemplares similares
-
LHCb Upgraded RICH 2 Engineering Design Review Report
por: Garsed, Philip John, et al.
Publicado: (2016) -
RICH2019: a proposal for the LHCb-RICH upgrade
por: D'Ambrosio, Carmelo, et al.
Publicado: (2013) -
Proposal for LHCb RICH detector enhancements during LHC Long Shutdown 3
por: Easo, Sajan, et al.
Publicado: (2021) -
Analysis and correction of the magnetic field effects in the Hybrid Photo-Detectors of the RICH2 Ring Imaging Cherenkov detector of LHCb
por: Cardinale, Roberta, et al.
Publicado: (2011) -
Analysis and correction of the magnetic field effects in the Hybrid Photo-Detectors of the RICH2 detector of LHCb
por: Cardinale, R, et al.
Publicado: (2011)