LHCb Upgraded RICH 2 Engineering Design Review Report

During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition...

Descripción completa

Detalles Bibliográficos
Autores principales: Garsed, Philip John, Wotton, Stephen, Cardinale, Roberta, Petrolini, Alessandro, Benettoni, Massimo, Simi, Gabriele, Zago, M, Easo, Sajan, D'Ambrosio, Carmelo, Frei, Christoph, He, Jibo, Piedigrossi, Didier
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2158852
_version_ 1780950793421062144
author Garsed, Philip John
Wotton, Stephen
Cardinale, Roberta
Petrolini, Alessandro
Benettoni, Massimo
Simi, Gabriele
Zago, M
Easo, Sajan
D'Ambrosio, Carmelo
Frei, Christoph
He, Jibo
Piedigrossi, Didier
author_facet Garsed, Philip John
Wotton, Stephen
Cardinale, Roberta
Petrolini, Alessandro
Benettoni, Massimo
Simi, Gabriele
Zago, M
Easo, Sajan
D'Ambrosio, Carmelo
Frei, Christoph
He, Jibo
Piedigrossi, Didier
author_sort Garsed, Philip John
collection CERN
description During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.
id cern-2158852
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling cern-21588522019-09-30T06:29:59Zhttp://cds.cern.ch/record/2158852engGarsed, Philip JohnWotton, StephenCardinale, RobertaPetrolini, AlessandroBenettoni, MassimoSimi, GabrieleZago, MEaso, SajanD'Ambrosio, CarmeloFrei, ChristophHe, JiboPiedigrossi, DidierLHCb Upgraded RICH 2 Engineering Design Review ReportDetectors and Experimental TechniquesDuring the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.LHCb-PUB-2016-015CERN-LHCb-PUB-2016-015oai:cds.cern.ch:21588522016-06-07
spellingShingle Detectors and Experimental Techniques
Garsed, Philip John
Wotton, Stephen
Cardinale, Roberta
Petrolini, Alessandro
Benettoni, Massimo
Simi, Gabriele
Zago, M
Easo, Sajan
D'Ambrosio, Carmelo
Frei, Christoph
He, Jibo
Piedigrossi, Didier
LHCb Upgraded RICH 2 Engineering Design Review Report
title LHCb Upgraded RICH 2 Engineering Design Review Report
title_full LHCb Upgraded RICH 2 Engineering Design Review Report
title_fullStr LHCb Upgraded RICH 2 Engineering Design Review Report
title_full_unstemmed LHCb Upgraded RICH 2 Engineering Design Review Report
title_short LHCb Upgraded RICH 2 Engineering Design Review Report
title_sort lhcb upgraded rich 2 engineering design review report
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2158852
work_keys_str_mv AT garsedphilipjohn lhcbupgradedrich2engineeringdesignreviewreport
AT wottonstephen lhcbupgradedrich2engineeringdesignreviewreport
AT cardinaleroberta lhcbupgradedrich2engineeringdesignreviewreport
AT petrolinialessandro lhcbupgradedrich2engineeringdesignreviewreport
AT benettonimassimo lhcbupgradedrich2engineeringdesignreviewreport
AT simigabriele lhcbupgradedrich2engineeringdesignreviewreport
AT zagom lhcbupgradedrich2engineeringdesignreviewreport
AT easosajan lhcbupgradedrich2engineeringdesignreviewreport
AT dambrosiocarmelo lhcbupgradedrich2engineeringdesignreviewreport
AT freichristoph lhcbupgradedrich2engineeringdesignreviewreport
AT hejibo lhcbupgradedrich2engineeringdesignreviewreport
AT piedigrossididier lhcbupgradedrich2engineeringdesignreviewreport