Cargando…
LHCb Upgraded RICH 2 Engineering Design Review Report
During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2158852 |
_version_ | 1780950793421062144 |
---|---|
author | Garsed, Philip John Wotton, Stephen Cardinale, Roberta Petrolini, Alessandro Benettoni, Massimo Simi, Gabriele Zago, M Easo, Sajan D'Ambrosio, Carmelo Frei, Christoph He, Jibo Piedigrossi, Didier |
author_facet | Garsed, Philip John Wotton, Stephen Cardinale, Roberta Petrolini, Alessandro Benettoni, Massimo Simi, Gabriele Zago, M Easo, Sajan D'Ambrosio, Carmelo Frei, Christoph He, Jibo Piedigrossi, Didier |
author_sort | Garsed, Philip John |
collection | CERN |
description | During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided. |
id | cern-2158852 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | cern-21588522019-09-30T06:29:59Zhttp://cds.cern.ch/record/2158852engGarsed, Philip JohnWotton, StephenCardinale, RobertaPetrolini, AlessandroBenettoni, MassimoSimi, GabrieleZago, MEaso, SajanD'Ambrosio, CarmeloFrei, ChristophHe, JiboPiedigrossi, DidierLHCb Upgraded RICH 2 Engineering Design Review ReportDetectors and Experimental TechniquesDuring the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.LHCb-PUB-2016-015CERN-LHCb-PUB-2016-015oai:cds.cern.ch:21588522016-06-07 |
spellingShingle | Detectors and Experimental Techniques Garsed, Philip John Wotton, Stephen Cardinale, Roberta Petrolini, Alessandro Benettoni, Massimo Simi, Gabriele Zago, M Easo, Sajan D'Ambrosio, Carmelo Frei, Christoph He, Jibo Piedigrossi, Didier LHCb Upgraded RICH 2 Engineering Design Review Report |
title | LHCb Upgraded RICH 2 Engineering Design Review Report |
title_full | LHCb Upgraded RICH 2 Engineering Design Review Report |
title_fullStr | LHCb Upgraded RICH 2 Engineering Design Review Report |
title_full_unstemmed | LHCb Upgraded RICH 2 Engineering Design Review Report |
title_short | LHCb Upgraded RICH 2 Engineering Design Review Report |
title_sort | lhcb upgraded rich 2 engineering design review report |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/2158852 |
work_keys_str_mv | AT garsedphilipjohn lhcbupgradedrich2engineeringdesignreviewreport AT wottonstephen lhcbupgradedrich2engineeringdesignreviewreport AT cardinaleroberta lhcbupgradedrich2engineeringdesignreviewreport AT petrolinialessandro lhcbupgradedrich2engineeringdesignreviewreport AT benettonimassimo lhcbupgradedrich2engineeringdesignreviewreport AT simigabriele lhcbupgradedrich2engineeringdesignreviewreport AT zagom lhcbupgradedrich2engineeringdesignreviewreport AT easosajan lhcbupgradedrich2engineeringdesignreviewreport AT dambrosiocarmelo lhcbupgradedrich2engineeringdesignreviewreport AT freichristoph lhcbupgradedrich2engineeringdesignreviewreport AT hejibo lhcbupgradedrich2engineeringdesignreviewreport AT piedigrossididier lhcbupgradedrich2engineeringdesignreviewreport |