Cargando…

The Linac4 project

Linac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope of the LHC injectors upgrade project. Linac4 will be connected to the Proton Synchrotron Booster (PSB) during the next long LHC shut-down and it will replace the current 50 MeV hadron linac, Linac2....

Descripción completa

Detalles Bibliográficos
Autor principal: Lombardi, Alessandra
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-HB2016-MOAM2P20
http://cds.cern.ch/record/2202099
_version_ 1780951319797825536
author Lombardi, Alessandra
author_facet Lombardi, Alessandra
author_sort Lombardi, Alessandra
collection CERN
description Linac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope of the LHC injectors upgrade project. Linac4 will be connected to the Proton Synchrotron Booster (PSB) during the next long LHC shut-down and it will replace the current 50 MeV hadron linac, Linac2. Linac4 is presently being commissioned, with the aim of achieving the final energy at the end of the year. A test of the injection chicane and a reliability run will follow. The beam commissioning, in steps of increasing energy, has been prepared by an extended series of studies and interlaced with phases of installation. In this paper we will detail the beam dynamics challenges and we will report on the commissioning results.
id cern-2202099
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling cern-22020992019-09-30T06:29:59Zdoi:10.18429/JACoW-HB2016-MOAM2P20http://cds.cern.ch/record/2202099engLombardi, AlessandraThe Linac4 projectAccelerators and Storage RingsLinac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope of the LHC injectors upgrade project. Linac4 will be connected to the Proton Synchrotron Booster (PSB) during the next long LHC shut-down and it will replace the current 50 MeV hadron linac, Linac2. Linac4 is presently being commissioned, with the aim of achieving the final energy at the end of the year. A test of the injection chicane and a reliability run will follow. The beam commissioning, in steps of increasing energy, has been prepared by an extended series of studies and interlaced with phases of installation. In this paper we will detail the beam dynamics challenges and we will report on the commissioning results.CERN-ACC-2016-0104oai:cds.cern.ch:22020992016-07-27
spellingShingle Accelerators and Storage Rings
Lombardi, Alessandra
The Linac4 project
title The Linac4 project
title_full The Linac4 project
title_fullStr The Linac4 project
title_full_unstemmed The Linac4 project
title_short The Linac4 project
title_sort linac4 project
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-HB2016-MOAM2P20
http://cds.cern.ch/record/2202099
work_keys_str_mv AT lombardialessandra thelinac4project
AT lombardialessandra linac4project