Cargando…
LHCb Run 2 Trigger Performance
During the first long shutdown of the LHC (2013-2014, LS1), the LHCb detector remained essentially unchanged, while the trigger system has been completely revisited. Upgrades to the LHCb computing infrastructure have allowed for high quality decay information to be calculated by the software trigger...
Autor principal: | Sciascia, Barbara |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.273.0029 http://cds.cern.ch/record/2208038 |
Ejemplares similares
-
LHCb Run 2 trigger performance
por: Sciascia, Barbara
Publicado: (2016) -
Calibration samples for particle identification at LHCb in Run 2
por: Lupton, Olli, et al.
Publicado: (2016) -
Computing strategy for PID calibration samples for LHCb Run 2
por: Anderlini, Lucio, et al.
Publicado: (2016) -
Low-$p_T$ dimuon triggers at LHCb in Run 2
por: Dettori, Francesco, et al.
Publicado: (2017) -
PID performance in Run 2 at LHCb
por: Seuthe, Alex
Publicado: (2021)