Cargando…
Measurement setup at light source operational: Milestone M4.3
The design of the experimental setup for the measurements of the FCC-hh beam screen prototype to be installed at the ANKA lightsource has been completed and the alignment strategy and procedure has been validated by the CERN and KIT teams. In this report, a complete description of the setup and the...
Autores principales: | Perez, Francis, Chiggiato, Paolo |
---|---|
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2210047 |
Ejemplares similares
-
Preliminary cryogenic-beam-vacuum system design: Milestone M4.5
por: Perez Rodriguez, Francisco Jose, et al.
Publicado: (2019) -
Beam screen model heat load and photo-electrons density analysis: Milestone 4.2
por: Perez Rodriguez, Francisco Jose, et al.
Publicado: (2016) -
Measurements of vacuum chamber at light source: Deliverable D4.2
por: Perez Rodriguez, Francisco Jose, et al.
Publicado: (2017) -
Preliminary beam screen and beam pipe engineering design: Deliverable D4.3
por: Perez Rodriguez, Francisco Jose, et al.
Publicado: (2017) -
Vacuum simulation of the LINAC4 H- source
por: Chiara Pasquino, CP, et al.
Publicado: (2012)