Cargando…
Installation and Commissioning of the new GLM Implantation Chamber
Summer student report about the work with the new implantation chamber for the GLM branch of ISOLDE. In the context of this project an API for the vacuum system of the new chamber was developed and implemented in web application that will be used to control the new implantation chamber at some poin...
Autor principal: | Pohl, Christoph |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2212529 |
Ejemplares similares
-
Installation of a cryogenic station to perform Emission Channeling experiments at low temperature
por: Amorim, Lígia
Publicado: (2008) -
Erbium implantation in Strontium Titanate
por: Araújo, J P, et al.
Publicado: (2001) -
Lattice location of implanted Cu in Si
por: Wahl, U, et al.
Publicado: (2003) -
Lattice location of implanted Ag in Si
por: Wahl, U, et al.
Publicado: (2003) -
Implanted light dopants in ZnSe
por: Ittermann, B, et al.
Publicado: (1999)