Cargando…
Testbeam Results from Pre and Post Irradiated Modules for the Upgrade of the ATLAS Strip Tracking Detector
The planned HL-LHC (High Luminosity LHC) in 2025 is being designed to maximise the physics potential of the LHC through a sizeable increase in the luminosity, reaching 1x1035cm-2s-1 after 10 years of operation. A consequence of this increased luminosity is the expected radiation damage at a integrat...
Autores principales: | Blue, Andrew, ATLAS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2230814 |
Ejemplares similares
-
First testbeam results of prototype modules for the upgrade of the ATLAS strip tracking detector
por: Kuehn, Susanne
Publicado: (2016) -
Testbeam studies of irradiated modules for the ATLAS ITk Strip upgrade
por: Steentoft, Jonas
Publicado: (2022) -
Testbeam evaluation of silicon strip modules for ATLAS Phase - II Strip Tracker Upgrade
por: Blue, Andrew, et al.
Publicado: (2018) -
Electrical performances of pre-productions staves for the ATLAS ITk Strip Detector Upgrade
por: Sharma, Punit, et al.
Publicado: (2022) -
Testbeam Studies with Silicon Strip Module Prototypes for the ATLAS-Detector towards the HL-LHC
por: Moser, Brian
Publicado: (2016)