LHC Availability 2016: Technical Stop 1 to Technical Stop 2
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Technical Stop 2 (TS2) in 2016. This period was dedicated to proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied f...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2235082 |
Sumario: | This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Technical Stop 2 (TS2) in 2016. This period was dedicated to proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker. |
---|