Cargando…
The Beam Profile Monitoring System for the CERN IRRAD Proton Facility
To perform proton irradiation experiments, CERN built during LS1 a new irradiation facility in the East Area at the Proton Synchrotron accelerator. At this facility, named IR-RAD, a high-intensity 24 GeV/c proton beam is used. During beam steering and irradiation, the intensity and the tra...
Autores principales: | Ravotti, F, Gkotse, B, Glaser, M, Matli, E, Pezzullo, G, Gan, K K, Kagan, H, Smith, S, Warner, J D |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2016-WEPG75 http://cds.cern.ch/record/2235850 |
Ejemplares similares
-
The Beam Profile Monitoring System for the IRRAD Proton Facility at the CERN PS East Area
por: Gkotse, Blerina, et al.
Publicado: (2016) -
System Architecture and Data Processing Capabilities of the Beam Profile Monitor for the CERN IRRAD Facility
por: Blerina Gkotse, et al.
Publicado: (2016) -
IRRAD: The new 24Gev/c Proton Irradiation Facility at CERN
por: Blerina Gkotse, et al.
Publicado: (2016) -
The CERN Proton Irradiation Facility IRRAD during and after the CERN Long Shutdown 2
por: Brethoux, Damien, et al.
Publicado: (2019) -
Towards a Unified Environmental Monitoring, Control and Data Management System for Irradiation Facilities: the CERN IRRAD Use Case
por: Gkotse, Blerina, et al.
Publicado: (2017)