HIE-Isolde: Commissioning and first results of the Mathilde system monitoring the positions of cavities and solenoids inside cryomodules
The new superconducting HIE-ISOLDE Linac replaced most of pre-existing REX ISOLDE facility at CERN. This upgrade involves the design, construction, installation and commissioning of 4 high-β cryomodules. Each high-β cryomodule houses five superconducting cavities and one superconducting solenoid. Be...
Autores principales: | Kautzmann, Guillaume, Gayde, Jean-Christophe, Klumb, Francis |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2237688 |
Ejemplares similares
-
HIE Isolde – General Presentation of MATHILDE
por: Kautzmann, Guillaume, et al.
Publicado: (2014) -
Lessons learned from the HIE-Isolde cavity production and cryomodule commissioning
por: Venturini Delsolaro, Walter, et al.
Publicado: (2018) -
HIE-ISOLDE: First Commissioning Experience
por: Venturini Delsolaro, Walter, et al.
Publicado: (2016) -
Assembling experience of the first two HIE-ISOLDE cryomodules
por: Therasse, Mathieu, et al.
Publicado: (2017) -
Design of the High Beta Cryomodule for the HIE-ISOLDE Upgrade at CERN
por: Williams, L, et al.
Publicado: (2011)