Cargando…

BE Newsletter Issue #8 September 2013

Inside this issue: Editorial – Ronny Billen Cryogenic Beam Loss Monitors (CryoBLM) for the LHC –Marcin Bartosik, Bernd Dehning, Barbara Holzer, Christoph Kurfuerst and Mariusz Sapinski, BE-BI-BL LHC Magnet Splice Quality Control – Jean-Charles Dumont, BE-OP-PS, Guy Crockford, BE-OP-LHC Virtual PC: T...

Descripción completa

Detalles Bibliográficos
Autor principal: Billen, Ronny
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/2243230
Descripción
Sumario:Inside this issue: Editorial – Ronny Billen Cryogenic Beam Loss Monitors (CryoBLM) for the LHC –Marcin Bartosik, Bernd Dehning, Barbara Holzer, Christoph Kurfuerst and Mariusz Sapinski, BE-BI-BL LHC Magnet Splice Quality Control – Jean-Charles Dumont, BE-OP-PS, Guy Crockford, BE-OP-LHC Virtual PC: The standard BE/CO tool for developers of controls applications – Luigi Gallerani, BE-CO-IN Reshaping of Injector alignment – Patrick Bestmann, Tobias Dobers, D. Missiaen, BE-ABP-SU Linac4: Premiers faisceaux à 3 MeV – J.-B. Lallement, BE-ABP-HSL Latest safety alerts – SafetyUnit Life in BE – Tom Levens, BE-RF-FB