Cargando…
CMS operations for Run II preparation and commissioning of the offline infrastructure
The restart of the LHC coincided with an intense activity for the CMS experiment. Both at the beginning of Run II in 2015 and the restart of operations in 2016, the collaboration was engaged in an extensive re-commissioning of the CMS data-taking operations. After the long stop, the detector was ful...
Autor principal: | Cerminara, Gianluca |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2253521 |
Ejemplares similares
-
Commissioning, Operation and Performance of the CMS Drift Tube Chambers
por: Cerminara, Gianluca
Publicado: (2009) -
Offline performance of the CMS Tracker during early Run II
por: Francois, Brieuc Arnaud L
Publicado: (2015) -
Experience with CMS Offline and Computing from Commissioning to Collisions
por: Klute, Markus
Publicado: (2010) -
HPC resources for CMS offline computing: an integration and scalability challenge for the Submission Infrastructure
por: Perez-Calero Yzquierdo, Antonio Maria, et al.
Publicado: (2023) -
CMS Data preparation for Run II
por: Fabozzi, Francesco
Publicado: (2014)