Cargando…
Yearly progress report on WA105/ProtoDUNE dual-phase (2017)
WA105/ProtoDUNE dual-phase aims at fully demonstrating the concept of a very large dual-phase LAr TPC and calibrating it with a charged particles test beam, in view of the application of this detector design for the construction of DUNE 10 kton far detector modules. In this document we report the g...
Autor principal: | Aimard, B |
---|---|
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2256436 |
Ejemplares similares
-
Yearly progress report on WA105/ProtoDUNE dual phase (2016)
por: Balik, G
Publicado: (2016) -
Yearly progress report on ProtoDUNE Dual Dhase (2020)
por: Autiero, D, et al.
Publicado: (2020) -
Yearly progress report on NP02 ProtoDUNE Dual Phase (2021)
por: Autiero, D, et al.
Publicado: (2021) -
ProtoDUNEs
por: Manenti, Laura
Publicado: (2017) -
ProtoDUNE Double Phase 2019 status report
por: Autiero, D, et al.
Publicado: (2019)