Cargando…
Optics measurements and corrections at the early commissioning of SuperKEKB
We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the...
Autores principales: | , , , , , , , , , , , , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR007 http://cds.cern.ch/record/2268264 |
_version_ | 1780954669077495808 |
---|---|
author | Ohnishi, Y Sugimoto, H Morita, A Koiso, H Oide, K Ohmi, K Zhou, D Funakoshi, Y Carmignani, N Liuzzo, S M Biagini, M E Boscolo, M Guiducci, S |
author_facet | Ohnishi, Y Sugimoto, H Morita, A Koiso, H Oide, K Ohmi, K Zhou, D Funakoshi, Y Carmignani, N Liuzzo, S M Biagini, M E Boscolo, M Guiducci, S |
author_sort | Ohnishi, Y |
collection | CERN |
description | We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the machine without the final focus magnets and detector solenoid(no collision); the collision with the final focus system and the Belle II detector will be performed at Phase-2 and Phase-3. The strategy for the luminosity upgrade is a novel "nano-beam” scheme found elsewhere[1]. In order to achieve the target luminosity, the vertical emittance has to be reduced by corrections of machine error measured with an orbit response. The vertical emittance should be achieved to be less than 10pm(∼0.2% coupling) during Phase-1 by fully utilizing correction tools of skew quadrupole-likecoils wound on sextupole magnets and power supplies for each correction coil in quadrupole magnets. |
format | info:eu-repo/semantics/article |
id | cern-2268264 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | cern-22682642019-09-30T06:29:59Z doi:10.18429/JACoW-IPAC2016-THPOR007 http://cds.cern.ch/record/2268264 eng Ohnishi, Y Sugimoto, H Morita, A Koiso, H Oide, K Ohmi, K Zhou, D Funakoshi, Y Carmignani, N Liuzzo, S M Biagini, M E Boscolo, M Guiducci, S Optics measurements and corrections at the early commissioning of SuperKEKB Accelerators and Storage Rings 6: Low Emittance Rings (LOW-e-RING) 6.1: Coordination and Communication We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the machine without the final focus magnets and detector solenoid(no collision); the collision with the final focus system and the Belle II detector will be performed at Phase-2 and Phase-3. The strategy for the luminosity upgrade is a novel "nano-beam” scheme found elsewhere[1]. In order to achieve the target luminosity, the vertical emittance has to be reduced by corrections of machine error measured with an orbit response. The vertical emittance should be achieved to be less than 10pm(∼0.2% coupling) during Phase-1 by fully utilizing correction tools of skew quadrupole-likecoils wound on sextupole magnets and power supplies for each correction coil in quadrupole magnets. info:eu-repo/grantAgreement/EC/FP7/312453 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/2268264 , (2016) pp. THPOR007 2017 |
spellingShingle | Accelerators and Storage Rings 6: Low Emittance Rings (LOW-e-RING) 6.1: Coordination and Communication Ohnishi, Y Sugimoto, H Morita, A Koiso, H Oide, K Ohmi, K Zhou, D Funakoshi, Y Carmignani, N Liuzzo, S M Biagini, M E Boscolo, M Guiducci, S Optics measurements and corrections at the early commissioning of SuperKEKB |
title | Optics measurements and corrections at the early commissioning of SuperKEKB |
title_full | Optics measurements and corrections at the early commissioning of SuperKEKB |
title_fullStr | Optics measurements and corrections at the early commissioning of SuperKEKB |
title_full_unstemmed | Optics measurements and corrections at the early commissioning of SuperKEKB |
title_short | Optics measurements and corrections at the early commissioning of SuperKEKB |
title_sort | optics measurements and corrections at the early commissioning of superkekb |
topic | Accelerators and Storage Rings 6: Low Emittance Rings (LOW-e-RING) 6.1: Coordination and Communication |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR007 http://cds.cern.ch/record/2268264 http://cds.cern.ch/record/2268264 |
work_keys_str_mv | AT ohnishiy opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT sugimotoh opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT moritaa opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT koisoh opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT oidek opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT ohmik opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT zhoud opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT funakoshiy opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT carmignanin opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT liuzzosm opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT biaginime opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT boscolom opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb AT guiduccis opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb |