Cargando…

Optics measurements and corrections at the early commissioning of SuperKEKB

We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the...

Descripción completa

Detalles Bibliográficos
Autores principales: Ohnishi, Y, Sugimoto, H, Morita, A, Koiso, H, Oide, K, Ohmi, K, Zhou, D, Funakoshi, Y, Carmignani, N, Liuzzo, S M, Biagini, M E, Boscolo, M, Guiducci, S
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR007
http://cds.cern.ch/record/2268264
_version_ 1780954669077495808
author Ohnishi, Y
Sugimoto, H
Morita, A
Koiso, H
Oide, K
Ohmi, K
Zhou, D
Funakoshi, Y
Carmignani, N
Liuzzo, S M
Biagini, M E
Boscolo, M
Guiducci, S
author_facet Ohnishi, Y
Sugimoto, H
Morita, A
Koiso, H
Oide, K
Ohmi, K
Zhou, D
Funakoshi, Y
Carmignani, N
Liuzzo, S M
Biagini, M E
Boscolo, M
Guiducci, S
author_sort Ohnishi, Y
collection CERN
description We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the machine without the final focus magnets and detector solenoid(no collision); the collision with the final focus system and the Belle II detector will be performed at Phase-2 and Phase-3. The strategy for the luminosity upgrade is a novel "nano-beam” scheme found elsewhere[1]. In order to achieve the target luminosity, the vertical emittance has to be reduced by corrections of machine error measured with an orbit response. The vertical emittance should be achieved to be less than 10pm(∼0.2% coupling) during Phase-1 by fully utilizing correction tools of skew quadrupole-likecoils wound on sextupole magnets and power supplies for each correction coil in quadrupole magnets.
format info:eu-repo/semantics/article
id cern-2268264
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling cern-22682642019-09-30T06:29:59Z doi:10.18429/JACoW-IPAC2016-THPOR007 http://cds.cern.ch/record/2268264 eng Ohnishi, Y Sugimoto, H Morita, A Koiso, H Oide, K Ohmi, K Zhou, D Funakoshi, Y Carmignani, N Liuzzo, S M Biagini, M E Boscolo, M Guiducci, S Optics measurements and corrections at the early commissioning of SuperKEKB Accelerators and Storage Rings 6: Low Emittance Rings (LOW-e-RING) 6.1: Coordination and Communication We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. We have three stages; Phase-1 is the commissioning of the machine without the final focus magnets and detector solenoid(no collision); the collision with the final focus system and the Belle II detector will be performed at Phase-2 and Phase-3. The strategy for the luminosity upgrade is a novel "nano-beam” scheme found elsewhere[1]. In order to achieve the target luminosity, the vertical emittance has to be reduced by corrections of machine error measured with an orbit response. The vertical emittance should be achieved to be less than 10pm(∼0.2% coupling) during Phase-1 by fully utilizing correction tools of skew quadrupole-likecoils wound on sextupole magnets and power supplies for each correction coil in quadrupole magnets. info:eu-repo/grantAgreement/EC/FP7/312453 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/2268264 , (2016) pp. THPOR007 2017
spellingShingle Accelerators and Storage Rings
6: Low Emittance Rings (LOW-e-RING)
6.1: Coordination and Communication
Ohnishi, Y
Sugimoto, H
Morita, A
Koiso, H
Oide, K
Ohmi, K
Zhou, D
Funakoshi, Y
Carmignani, N
Liuzzo, S M
Biagini, M E
Boscolo, M
Guiducci, S
Optics measurements and corrections at the early commissioning of SuperKEKB
title Optics measurements and corrections at the early commissioning of SuperKEKB
title_full Optics measurements and corrections at the early commissioning of SuperKEKB
title_fullStr Optics measurements and corrections at the early commissioning of SuperKEKB
title_full_unstemmed Optics measurements and corrections at the early commissioning of SuperKEKB
title_short Optics measurements and corrections at the early commissioning of SuperKEKB
title_sort optics measurements and corrections at the early commissioning of superkekb
topic Accelerators and Storage Rings
6: Low Emittance Rings (LOW-e-RING)
6.1: Coordination and Communication
url https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR007
http://cds.cern.ch/record/2268264
http://cds.cern.ch/record/2268264
work_keys_str_mv AT ohnishiy opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT sugimotoh opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT moritaa opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT koisoh opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT oidek opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT ohmik opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT zhoud opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT funakoshiy opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT carmignanin opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT liuzzosm opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT biaginime opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT boscolom opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb
AT guiduccis opticsmeasurementsandcorrectionsattheearlycommissioningofsuperkekb