Cargando…
LHC Availability 2017: Restart to Technical Stop 1
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2017. This period consisted of recommissioning the LHC following the Extended year End Technical Stop (EYETS 2016-17), and proton physics with a bunch spacing of 25ns. This note has been pr...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2273232 |
Sumario: | This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2017. This period consisted of recommissioning the LHC following the Extended year End Technical Stop (EYETS 2016-17), and proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker. |
---|