Cargando…

LHC Availability 2017: Restart to Technical Stop 1

This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2017. This period consisted of recommissioning the LHC following the Extended year End Technical Stop (EYETS 2016-17), and proton physics with a bunch spacing of 25ns. This note has been pr...

Descripción completa

Detalles Bibliográficos
Autores principales: Todd, Benjamin, Ponce, Laurette, Apollonio, Andrea
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2273232
Descripción
Sumario:This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2017. This period consisted of recommissioning the LHC following the Extended year End Technical Stop (EYETS 2016-17), and proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker.