Cargando…
LHC Availability 2017: Restart to Technical Stop 1
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2017. This period consisted of recommissioning the LHC following the Extended year End Technical Stop (EYETS 2016-17), and proton physics with a bunch spacing of 25ns. This note has been pr...
Autores principales: | Todd, Benjamin, Ponce, Laurette, Apollonio, Andrea |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2273232 |
Ejemplares similares
-
LHC Availability 2016: Restart to Technical Stop 1
por: Todd, Benjamin, et al.
Publicado: (2016) -
LHC Availability 2018: Restart to Technical Stop 1
por: Todd, Benjamin, et al.
Publicado: (2018) -
LHC Availability 2017: Technical Stop 1 to Technical Stop 2
por: Todd, Benjamin, et al.
Publicado: (2017) -
LHC Availability 2016: Technical Stop 1 to Technical Stop 2
por: Todd, Benjamin, et al.
Publicado: (2016) -
LHC Availability 2018: Technical Stop 1 to Technical Stop 2
por: Todd, Benjamin, et al.
Publicado: (2018)