Cargando…

Availability modeling approach for future circular colliders based on the LHC operation experience

Reaching the challenging integrated luminosity production goals of a future circular hadron collider (FCC-hh) and high luminosity LHC (HL-LHC) requires a thorough understanding of today’s most powerful high energy physics research infrastructure, the LHC accelerator complex at CERN. FCC-hh, a 4 time...

Descripción completa

Detalles Bibliográficos
Autores principales: Niemi, Arto, Apollonio, Andrea, Gutleber, Johannes, Sollander, Peter, Penttinen, Jussi-Pekka, Virtanen, Seppo Johannes
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1103/PhysRevAccelBeams.19.121003
http://cds.cern.ch/record/2281376
_version_ 1780955572468711424
author Niemi, Arto
Apollonio, Andrea
Gutleber, Johannes
Sollander, Peter
Penttinen, Jussi-Pekka
Virtanen, Seppo Johannes
author_facet Niemi, Arto
Apollonio, Andrea
Gutleber, Johannes
Sollander, Peter
Penttinen, Jussi-Pekka
Virtanen, Seppo Johannes
author_sort Niemi, Arto
collection CERN
description Reaching the challenging integrated luminosity production goals of a future circular hadron collider (FCC-hh) and high luminosity LHC (HL-LHC) requires a thorough understanding of today’s most powerful high energy physics research infrastructure, the LHC accelerator complex at CERN. FCC-hh, a 4 times larger collider ring aims at delivering 10–20  ab$^-$$^1$ of integrated luminosity at 7 times higher collision energy. Since the identification of the key factors that impact availability and cost is far from obvious, a dedicated activity has been launched in the frame of the future circular collider study to develop models to study possible ways to optimize accelerator availability. This paper introduces the FCC reliability and availability study, which takes a fresh new look at assessing and modeling reliability and availability of particle accelerator infrastructures. The paper presents a probabilistic approach for Monte Carlo simulation of the machine operational cycle, schedule and availability for physics. The approach is based on best-practice, industrially applied reliability analysis methods. It relies on failure rate and repair time distributions to calculate impacts on availability. The main source of information for the study is coming from CERN accelerator operation and maintenance data. Recent improvements in LHC failure tracking help improving the accuracy of modeling of LHC performance. The model accuracy and prediction capabilities are discussed by comparing obtained results with past LHC operational data.
id cern-2281376
institution Organización Europea para la Investigación Nuclear
publishDate 2016
record_format invenio
spelling cern-22813762019-09-30T06:29:59Zdoi:10.1103/PhysRevAccelBeams.19.121003http://cds.cern.ch/record/2281376Niemi, ArtoApollonio, AndreaGutleber, JohannesSollander, PeterPenttinen, Jussi-PekkaVirtanen, Seppo JohannesAvailability modeling approach for future circular colliders based on the LHC operation experienceAccelerators and Storage RingsReaching the challenging integrated luminosity production goals of a future circular hadron collider (FCC-hh) and high luminosity LHC (HL-LHC) requires a thorough understanding of today’s most powerful high energy physics research infrastructure, the LHC accelerator complex at CERN. FCC-hh, a 4 times larger collider ring aims at delivering 10–20  ab$^-$$^1$ of integrated luminosity at 7 times higher collision energy. Since the identification of the key factors that impact availability and cost is far from obvious, a dedicated activity has been launched in the frame of the future circular collider study to develop models to study possible ways to optimize accelerator availability. This paper introduces the FCC reliability and availability study, which takes a fresh new look at assessing and modeling reliability and availability of particle accelerator infrastructures. The paper presents a probabilistic approach for Monte Carlo simulation of the machine operational cycle, schedule and availability for physics. The approach is based on best-practice, industrially applied reliability analysis methods. It relies on failure rate and repair time distributions to calculate impacts on availability. The main source of information for the study is coming from CERN accelerator operation and maintenance data. Recent improvements in LHC failure tracking help improving the accuracy of modeling of LHC performance. The model accuracy and prediction capabilities are discussed by comparing obtained results with past LHC operational data.CERN-ACC-2017-0076oai:cds.cern.ch:22813762016-12-27
spellingShingle Accelerators and Storage Rings
Niemi, Arto
Apollonio, Andrea
Gutleber, Johannes
Sollander, Peter
Penttinen, Jussi-Pekka
Virtanen, Seppo Johannes
Availability modeling approach for future circular colliders based on the LHC operation experience
title Availability modeling approach for future circular colliders based on the LHC operation experience
title_full Availability modeling approach for future circular colliders based on the LHC operation experience
title_fullStr Availability modeling approach for future circular colliders based on the LHC operation experience
title_full_unstemmed Availability modeling approach for future circular colliders based on the LHC operation experience
title_short Availability modeling approach for future circular colliders based on the LHC operation experience
title_sort availability modeling approach for future circular colliders based on the lhc operation experience
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1103/PhysRevAccelBeams.19.121003
http://cds.cern.ch/record/2281376
work_keys_str_mv AT niemiarto availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience
AT apollonioandrea availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience
AT gutleberjohannes availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience
AT sollanderpeter availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience
AT penttinenjussipekka availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience
AT virtanenseppojohannes availabilitymodelingapproachforfuturecircularcollidersbasedonthelhcoperationexperience