Cargando…

LHC Availability 2017: Technical Stop 1 to Technical Stop 2

This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Technical Stop 2 (TS2) in 2017. This period was dedicated to proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied f...

Descripción completa

Detalles Bibliográficos
Autores principales: Todd, Benjamin, Ponce, Laurette, Apollonio, Andrea, Walsh, David John
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2286389
Descripción
Sumario:This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Technical Stop 2 (TS2) in 2017. This period was dedicated to proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker.