Cargando…

Rock samples from LEP/LHC tunnel excavation

Rock samples taken from 0 to 170 m below ground on the CERN site when the LEP (Large Electron Positron collider) pit number 6 was drilled in Bois-chatton (Versonnex). The challenges of LHC civil engineering: A mosaic of works, structures and workers of differents crafts and origins. Three consulting...

Descripción completa

Detalles Bibliográficos
Publicado: 1985
Materias:
Acceso en línea:http://cds.cern.ch/record/2289741
Descripción
Sumario:Rock samples taken from 0 to 170 m below ground on the CERN site when the LEP (Large Electron Positron collider) pit number 6 was drilled in Bois-chatton (Versonnex). The challenges of LHC civil engineering: A mosaic of works, structures and workers of differents crafts and origins. Three consulting consortia for the engineering and the follow-up of the works. Four industrial consortia for doing the job. A young team of 25 CERN staff, 30 surface buildings, 32 caverns of all sizes, 170 000 m3 of concrete, 420 000 m3 excavated. 1998-2004 : six years of work and 340 millions Swiss Francs.