Cargando…
The CMS trigger in Run 2
During its second period of operation (Run 2) which started in 2015, the LHC will reach a peak instantaneous luminosity of approximately 2$\times 10^{34}$~cm$^{-2}s^{-1}$ with an average pile-up of about 55, far larger than the design value. Under these conditions, the online event selection is a ve...
Autor principal: | Tosi, Mia |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.314.0523 http://cds.cern.ch/record/2290106 |
Ejemplares similares
-
Tracking at High Level Trigger in CMS
por: Tosi, Mia
Publicado: (2014) -
Performance of Tracking, b-tagging and Jet/MET reconstruction at the CMS High Level Trigger
por: Tosi, Mia
Publicado: (2015) -
The CMS electron and photon trigger for the LHC Run 2
por: Beschi, Andrea
Publicado: (2017) -
Tau lepton trigger and identification at CMS in Run-2
por: Davignon, Olivier
Publicado: (2016) -
CMS Run 2 High Level Trigger Performance
por: Sert, Hale
Publicado: (2019)