Cargando…
Next generation ATCA control infrastructure for the CMS Phase-2 upgrades
A next generation control infrastructure to be used in Advanced TCA (ATCA) blades at CMS experiment is being designed and tested. Several ATCA systems are being prepared for the High-Luminosity LHC (HL-LHC) and will be installed at CMS during technical stops. The next generation control infrastructu...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.313.0102 http://cds.cern.ch/record/2290895 |
_version_ | 1780956370629033984 |
---|---|
author | Smith, Wesley Gorski, Tom Svetek, Aleš Tikalsky, Jes Fobes, Robert Dasu, Sridhara Smith, Wesley Vicente, Marcelo |
author_facet | Smith, Wesley Gorski, Tom Svetek, Aleš Tikalsky, Jes Fobes, Robert Dasu, Sridhara Smith, Wesley Vicente, Marcelo |
author_sort | Smith, Wesley |
collection | CERN |
description | A next generation control infrastructure to be used in Advanced TCA (ATCA) blades at CMS experiment is being designed and tested. Several ATCA systems are being prepared for the High-Luminosity LHC (HL-LHC) and will be installed at CMS during technical stops. The next generation control infrastructure will provide all the necessary hardware, firmware and software required in these systems, decreasing development time and increasing flexibility. The complete infrastructure includes an Intelligent Platform Management Controller (IPMC), a Module Management Controller (MMC) and an Embedded Linux Mezzanine (ELM) processing card. |
id | cern-2290895 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | cern-22908952019-09-30T06:29:59Zdoi:10.22323/1.313.0102http://cds.cern.ch/record/2290895engSmith, WesleyGorski, TomSvetek, AlešTikalsky, JesFobes, RobertDasu, SridharaSmith, WesleyVicente, MarceloNext generation ATCA control infrastructure for the CMS Phase-2 upgradesDetectors and Experimental TechniquesA next generation control infrastructure to be used in Advanced TCA (ATCA) blades at CMS experiment is being designed and tested. Several ATCA systems are being prepared for the High-Luminosity LHC (HL-LHC) and will be installed at CMS during technical stops. The next generation control infrastructure will provide all the necessary hardware, firmware and software required in these systems, decreasing development time and increasing flexibility. The complete infrastructure includes an Intelligent Platform Management Controller (IPMC), a Module Management Controller (MMC) and an Embedded Linux Mezzanine (ELM) processing card.CMS-CR-2017-377oai:cds.cern.ch:22908952017-10-22 |
spellingShingle | Detectors and Experimental Techniques Smith, Wesley Gorski, Tom Svetek, Aleš Tikalsky, Jes Fobes, Robert Dasu, Sridhara Smith, Wesley Vicente, Marcelo Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title | Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title_full | Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title_fullStr | Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title_full_unstemmed | Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title_short | Next generation ATCA control infrastructure for the CMS Phase-2 upgrades |
title_sort | next generation atca control infrastructure for the cms phase-2 upgrades |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.22323/1.313.0102 http://cds.cern.ch/record/2290895 |
work_keys_str_mv | AT smithwesley nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT gorskitom nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT svetekales nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT tikalskyjes nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT fobesrobert nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT dasusridhara nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT smithwesley nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades AT vicentemarcelo nextgenerationatcacontrolinfrastructureforthecmsphase2upgrades |