Cargando…
Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade
The CMS Collaboration has been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HL-LHC. Ten pre-production detectors were built at CERN to commission the first assembly...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/NSSMIC.2017.8532942 http://cds.cern.ch/record/2294164 |
_version_ | 1780956638115528704 |
---|---|
author | Vai, Ilaria Colafranceschi, Stefano |
author_facet | Vai, Ilaria Colafranceschi, Stefano |
author_sort | Vai, Ilaria |
collection | CERN |
description | The CMS Collaboration has been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HL-LHC. Ten pre-production detectors were built at CERN to commission the first assembly line and the quality controls. These were installed in the CMS detector in early 2017 and are currently participating in the 2017 LHC run. The collaboration has prepared several additional assembly and quality control lines for distributed mass production of 160 GEM detectors at various sites worldwide. During 2017, these additional production sites have been optimizing construction techniques and quality control procedures and validating them against common specifications by constructing additional pre-production detectors. Using the specific experience from one production site as an example, we discuss how the quality controls make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors will be presented. |
id | cern-2294164 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | cern-22941642019-09-30T06:29:59Zdoi:10.1109/NSSMIC.2017.8532942http://cds.cern.ch/record/2294164engVai, IlariaColafranceschi, StefanoOperational experience with the GEM detector assembly lines for the CMS forward muon upgradeDetectors and Experimental TechniquesThe CMS Collaboration has been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HL-LHC. Ten pre-production detectors were built at CERN to commission the first assembly line and the quality controls. These were installed in the CMS detector in early 2017 and are currently participating in the 2017 LHC run. The collaboration has prepared several additional assembly and quality control lines for distributed mass production of 160 GEM detectors at various sites worldwide. During 2017, these additional production sites have been optimizing construction techniques and quality control procedures and validating them against common specifications by constructing additional pre-production detectors. Using the specific experience from one production site as an example, we discuss how the quality controls make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors will be presented.CMS-CR-2017-423oai:cds.cern.ch:22941642017-11-16 |
spellingShingle | Detectors and Experimental Techniques Vai, Ilaria Colafranceschi, Stefano Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title | Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title_full | Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title_fullStr | Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title_full_unstemmed | Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title_short | Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade |
title_sort | operational experience with the gem detector assembly lines for the cms forward muon upgrade |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1109/NSSMIC.2017.8532942 http://cds.cern.ch/record/2294164 |
work_keys_str_mv | AT vaiilaria operationalexperiencewiththegemdetectorassemblylinesforthecmsforwardmuonupgrade AT colafranceschistefano operationalexperiencewiththegemdetectorassemblylinesforthecmsforwardmuonupgrade |