Cargando…
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The...
Autores principales: | Roberts, J., Skowronski, P., Burrows, P.N., Christian, G.B., Corsini, R., Ghigo, A., Marcellini, F., Perry, C. |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1103/PhysRevAccelBeams.21.011001 http://cds.cern.ch/record/2304134 |
Ejemplares similares
-
Luminosity Performance Studies of Linear Colliders with Intra-train Feedback Systems
por: Resta-Lopez, J., et al.
Publicado: (2009) -
High-resolution, low-latency, bunch-by-bunch feedback system for nanobeam stabilization
por: Bett, D.R., et al.
Publicado: (2022) -
X-band crab cavities for the CLIC beam delivery system
por: Burt, G., et al.
Publicado: (2009) -
An $ep$ collider based on proton-driven plasma wakefield acceleration
por: Wing, M., et al.
Publicado: (2014) -
Central Diffraction at the LHCb
por: Lamsa, Jerry W., et al.
Publicado: (2009)