MD#2183: Calibration of the IR6 B2 diamond BLMs

In case of an asynchronous beam dump with a fully filled LHC machine, causing ~40 bunches to impact on the movable dump protection absorber (TCDQ), it is expected that all standard ionisation chamber Beam Loss Monitors (IC BLM) around the LHC dumping region in IR6 will be saturated. Diamond Beam Los...

Descripción completa

Detalles Bibliográficos
Autores principales: Valette, Matthieu, Wollmann, Daniel, Lindstrom, Bjorn Hans Filip
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2308379
_version_ 1780957703830503424
author Valette, Matthieu
Wollmann, Daniel
Lindstrom, Bjorn Hans Filip
author_facet Valette, Matthieu
Wollmann, Daniel
Lindstrom, Bjorn Hans Filip
author_sort Valette, Matthieu
collection CERN
description In case of an asynchronous beam dump with a fully filled LHC machine, causing ~40 bunches to impact on the movable dump protection absorber (TCDQ), it is expected that all standard ionisation chamber Beam Loss Monitors (IC BLM) around the LHC dumping region in IR6 will be saturated. Diamond Beam Loss Monitors (dBLM) were therefore installed next to the TCDQ downstream of the extraction kickers. These detectors allow resolving losses at a nanosecond timescale and with a dynamic range of several orders of magnitude; thus, allowing to derive the number of nominal bunches impacting the TCDQ. After a first series of calibrations using asynchronous beam dump tests, an experiment was conducted during MD#1182 to demonstrate the possibility of resolving a nominal bunch hitting the TCDQ. During this first MD only the Beam 1 dBLM was calibrated appropriately, a second calibration MD was therefore performed in 2017 for the B2 system. Results from this MD and conclusions regarding dBLM saturation with a top energy nominal bunch are discussed in this note, which also includes results from MD#2930.
id cern-2308379
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-23083792019-09-30T06:29:59Zhttp://cds.cern.ch/record/2308379engValette, MatthieuWollmann, DanielLindstrom, Bjorn Hans FilipMD#2183: Calibration of the IR6 B2 diamond BLMsAccelerators and Storage RingsIn case of an asynchronous beam dump with a fully filled LHC machine, causing ~40 bunches to impact on the movable dump protection absorber (TCDQ), it is expected that all standard ionisation chamber Beam Loss Monitors (IC BLM) around the LHC dumping region in IR6 will be saturated. Diamond Beam Loss Monitors (dBLM) were therefore installed next to the TCDQ downstream of the extraction kickers. These detectors allow resolving losses at a nanosecond timescale and with a dynamic range of several orders of magnitude; thus, allowing to derive the number of nominal bunches impacting the TCDQ. After a first series of calibrations using asynchronous beam dump tests, an experiment was conducted during MD#1182 to demonstrate the possibility of resolving a nominal bunch hitting the TCDQ. During this first MD only the Beam 1 dBLM was calibrated appropriately, a second calibration MD was therefore performed in 2017 for the B2 system. Results from this MD and conclusions regarding dBLM saturation with a top energy nominal bunch are discussed in this note, which also includes results from MD#2930.CERN-ACC-2018-0011oai:cds.cern.ch:23083792018-03-13
spellingShingle Accelerators and Storage Rings
Valette, Matthieu
Wollmann, Daniel
Lindstrom, Bjorn Hans Filip
MD#2183: Calibration of the IR6 B2 diamond BLMs
title MD#2183: Calibration of the IR6 B2 diamond BLMs
title_full MD#2183: Calibration of the IR6 B2 diamond BLMs
title_fullStr MD#2183: Calibration of the IR6 B2 diamond BLMs
title_full_unstemmed MD#2183: Calibration of the IR6 B2 diamond BLMs
title_short MD#2183: Calibration of the IR6 B2 diamond BLMs
title_sort md#2183: calibration of the ir6 b2 diamond blms
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2308379
work_keys_str_mv AT valettematthieu md2183calibrationoftheir6b2diamondblms
AT wollmanndaniel md2183calibrationoftheir6b2diamondblms
AT lindstrombjornhansfilip md2183calibrationoftheir6b2diamondblms