Cargando…

Installation and commissioning of instantaneous dose rate monitoring system

INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign suppor...

Descripción completa

Detalles Bibliográficos
Autor principal: Iaydjiev, Plamen
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2311230
_version_ 1780957869991002112
author Iaydjiev, Plamen
author_facet Iaydjiev, Plamen
author_sort Iaydjiev, Plamen
collection CERN
description INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users.
format info:eu-repo/semantics/article
id cern-2311230
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-23112302019-09-30T06:29:59Z http://cds.cern.ch/record/2311230 eng Iaydjiev, Plamen Installation and commissioning of instantaneous dose rate monitoring system Detectors and Experimental Techniques 15: Upgrade of beam and irradiation test infrastructure INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users. info:eu-repo/grantAgreement/EC/FP7/654168 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/2311230 2018
spellingShingle Detectors and Experimental Techniques
15: Upgrade of beam and irradiation test infrastructure
Iaydjiev, Plamen
Installation and commissioning of instantaneous dose rate monitoring system
title Installation and commissioning of instantaneous dose rate monitoring system
title_full Installation and commissioning of instantaneous dose rate monitoring system
title_fullStr Installation and commissioning of instantaneous dose rate monitoring system
title_full_unstemmed Installation and commissioning of instantaneous dose rate monitoring system
title_short Installation and commissioning of instantaneous dose rate monitoring system
title_sort installation and commissioning of instantaneous dose rate monitoring system
topic Detectors and Experimental Techniques
15: Upgrade of beam and irradiation test infrastructure
url http://cds.cern.ch/record/2311230
http://cds.cern.ch/record/2311230
work_keys_str_mv AT iaydjievplamen installationandcommissioningofinstantaneousdoseratemonitoringsystem