Cargando…
Installation and commissioning of instantaneous dose rate monitoring system
INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign suppor...
Autor principal: | |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2311230 |
_version_ | 1780957869991002112 |
---|---|
author | Iaydjiev, Plamen |
author_facet | Iaydjiev, Plamen |
author_sort | Iaydjiev, Plamen |
collection | CERN |
description | INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users. |
format | info:eu-repo/semantics/article |
id | cern-2311230 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | cern-23112302019-09-30T06:29:59Z http://cds.cern.ch/record/2311230 eng Iaydjiev, Plamen Installation and commissioning of instantaneous dose rate monitoring system Detectors and Experimental Techniques 15: Upgrade of beam and irradiation test infrastructure INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users. info:eu-repo/grantAgreement/EC/FP7/654168 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/2311230 2018 |
spellingShingle | Detectors and Experimental Techniques 15: Upgrade of beam and irradiation test infrastructure Iaydjiev, Plamen Installation and commissioning of instantaneous dose rate monitoring system |
title | Installation and commissioning of instantaneous dose rate monitoring system |
title_full | Installation and commissioning of instantaneous dose rate monitoring system |
title_fullStr | Installation and commissioning of instantaneous dose rate monitoring system |
title_full_unstemmed | Installation and commissioning of instantaneous dose rate monitoring system |
title_short | Installation and commissioning of instantaneous dose rate monitoring system |
title_sort | installation and commissioning of instantaneous dose rate monitoring system |
topic | Detectors and Experimental Techniques 15: Upgrade of beam and irradiation test infrastructure |
url | http://cds.cern.ch/record/2311230 http://cds.cern.ch/record/2311230 |
work_keys_str_mv | AT iaydjievplamen installationandcommissioningofinstantaneousdoseratemonitoringsystem |