Cargando…
The 2017 Xe run at CERN Linac3: measurements and beam dynamics simulations
At CERN quark-gluon plasma and fixed target ion experiments are performed thanks to the Heavy-ion Facility, composed by different accelerators. The starting point is CERN Linac3, which delivers 4.2 MeV/u ion beams to the Low Energy Ion Ring (LEIR). In 2017 Linac3 accelerated Xe instead of the most usu...
Autores principales: | Benedetti, Stefano, Bellodi, Giulia, Kuchler, Detlef, Lombardi, Alessandra, Wenander, Fredrik John Carl, Toivanen, Ville Aleksi |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.5066086 http://cds.cern.ch/record/2623666 |
Ejemplares similares
-
Simulation and Measurement Campaigns for Characterization and Performance Improvement of the CERN Heavy Ion Linac3
por: Bellodi, Giulia, et al.
Publicado: (2018) -
Linac3 LEBT beam measurements during the 2014-2015 Argon ion run
por: Bellodi, Giulia, et al.
Publicado: (2016) -
Recent Developments with the GTS-LHC ECR Ion Source at CERN
por: Toivanen, Ville, et al.
Publicado: (2017) -
Stripper foil investigations at Linac3
por: Bellodi, Giulia, et al.
Publicado: (2020) -
Thermal Analysis of the Linac3 GTS-LHC ECR Ion Source
por: Fichera, Claudio, et al.
Publicado: (2017)