Cargando…
Beam Tests on the ATLAS Tile Calorimeter Demonstrator Module
The Large Hadron Collider (LHC) Phase II upgrade aims to increase the accelerator luminosity by a factor of 5-10. Due to the expected higher radiation levels and the aging of the current electronics, a new read-out system of the ATLAS experiment hadronic calorimeter (TileCal) is needed. A prototype...
Autores principales: | Valdes Santurio, Eduardo, Oreglia, Mark, ATLAS Tile Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2018.10.066 http://cds.cern.ch/record/2624587 |
Ejemplares similares
-
Beam Tests on the ATLAS Tile Calorimeter Demonstrator Module
por: Valdes Santurio, Eduardo, et al.
Publicado: (2018) -
Data acquisition and processing in the ATLAS Tile Calorimeter Phase-II Upgrade Demonstrator
por: Valero, Alberto, et al.
Publicado: (2016) -
Data acquisition and processing in the ATLAS tile calorimeter phase-II upgrade demonstrator
por: Valero, Alberto, et al.
Publicado: (2017) -
Performance and calibration of the ATLAS Tile Calorimeter
por: ATLAS Tile Collaboration
Publicado: (2023) -
An updated design of the read out link and control board for the Phase-2 upgrade of the ATLAS Tile Calorimeter.
por: Valdes Santurio, Eduardo, et al.
Publicado: (2018)