Cargando…

Commissioning and performance of the GE1/1 slice test detectors

The performance of the CMS muon system, as it was instrumented in Run 1, will be deeply called into questions in the next few years. The foreseen increase in luminosity of LHC, up to 5 times the nominal value, will induce a huge increase of the pileup and of the radiation background. The CMS Collabo...

Descripción completa

Detalles Bibliográficos
Autor principal: Vai, Ilaria
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2018.10.057
http://cds.cern.ch/record/2629838
_version_ 1780959376734945280
author Vai, Ilaria
author_facet Vai, Ilaria
author_sort Vai, Ilaria
collection CERN
description The performance of the CMS muon system, as it was instrumented in Run 1, will be deeply called into questions in the next few years. The foreseen increase in luminosity of LHC, up to 5 times the nominal value, will induce a huge increase of the pileup and of the radiation background. The CMS Collaboration then started an overall upgrade program, which foresees interventions on both the already existing chambers and electronics, but also the completion of the existing muon stations with new detectors in the high-eta region.The first of these new stations, called GE1/1, is expected to reduce the Level-1 muon trigger rate and improve the tracking performance in a harsh radiation environment. The technology selected is the Gas Electron Multiplier (GEM), in particular Triple-GEM, whose complete qualification, performed in the last few years of R and D, led to the approval of the installation of the full station in the second Long Shutdown. A first installation of a demonstrator started at the beginning of 2017 five Triple-GEM superchambers were installed in the CMS muon system with the aim of gaining operational experience and demonstrating the integration of the GE1/1 system into the trigger.This contribution will present the results obtained from the commissioning of the installed chambers. The performance of the detectors in the 2017 and beginning of 2018 LHC Run will be discussed too.
id cern-2629838
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-26298382022-01-14T15:04:09Zdoi:10.1016/j.nima.2018.10.057http://cds.cern.ch/record/2629838engVai, IlariaCommissioning and performance of the GE1/1 slice test detectorsDetectors and Experimental TechniquesThe performance of the CMS muon system, as it was instrumented in Run 1, will be deeply called into questions in the next few years. The foreseen increase in luminosity of LHC, up to 5 times the nominal value, will induce a huge increase of the pileup and of the radiation background. The CMS Collaboration then started an overall upgrade program, which foresees interventions on both the already existing chambers and electronics, but also the completion of the existing muon stations with new detectors in the high-eta region.The first of these new stations, called GE1/1, is expected to reduce the Level-1 muon trigger rate and improve the tracking performance in a harsh radiation environment. The technology selected is the Gas Electron Multiplier (GEM), in particular Triple-GEM, whose complete qualification, performed in the last few years of R and D, led to the approval of the installation of the full station in the second Long Shutdown. A first installation of a demonstrator started at the beginning of 2017 five Triple-GEM superchambers were installed in the CMS muon system with the aim of gaining operational experience and demonstrating the integration of the GE1/1 system into the trigger.This contribution will present the results obtained from the commissioning of the installed chambers. The performance of the detectors in the 2017 and beginning of 2018 LHC Run will be discussed too.We present the status of the commissioning and integration of the GE1/1 slice test detectors into CMS. Ten Triple-GEM detectors were installed at the beginning of 2017 in CMS to obtain installation and commissioning expertise, as well as to demonstrate the integration into the CMS system. The paper will enlight the configuration of the slice test and then focus mainly on the integration activities and status.CMS-CR-2018-071oai:cds.cern.ch:26298382018-06-07
spellingShingle Detectors and Experimental Techniques
Vai, Ilaria
Commissioning and performance of the GE1/1 slice test detectors
title Commissioning and performance of the GE1/1 slice test detectors
title_full Commissioning and performance of the GE1/1 slice test detectors
title_fullStr Commissioning and performance of the GE1/1 slice test detectors
title_full_unstemmed Commissioning and performance of the GE1/1 slice test detectors
title_short Commissioning and performance of the GE1/1 slice test detectors
title_sort commissioning and performance of the ge1/1 slice test detectors
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1016/j.nima.2018.10.057
http://cds.cern.ch/record/2629838
work_keys_str_mv AT vaiilaria commissioningandperformanceofthege11slicetestdetectors