Cargando…

HRMT45 Installation in SPS Tunnel BA7

The HRMT45 module undergoing the last checks during its installation at the HiRadMat TNC facility before getting ready to take beam. The fast connections at the bottom of the support table allow the power supply of the motors and the instrumentation as well as the communication with the acquisition...

Descripción completa

Detalles Bibliográficos
Autor principal: Ordan, Julien Marius
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2634987
_version_ 1780959788138496000
author Ordan, Julien Marius
author_facet Ordan, Julien Marius
author_sort Ordan, Julien Marius
collection CERN
description The HRMT45 module undergoing the last checks during its installation at the HiRadMat TNC facility before getting ready to take beam. The fast connections at the bottom of the support table allow the power supply of the motors and the instrumentation as well as the communication with the acquisition system located in the shielded TT61 area. The water supply is also done via quick connectors, in order to obtain the necessary flow for cooling down the device during the experiment. Additionally, the tank must be connected to a primary vacuum pump to ensure a stable vacuum level at all times, especially upon high intensity beam shots when the graphite material inside the tank outgasses the most. The HRMT45 test was successfully completed on 25th August at 3:30 am
id cern-2634987
institution Organización Europea para la Investigación Nuclear
publishDate 2018
record_format invenio
spelling cern-26349872019-09-30T06:29:59Zhttp://cds.cern.ch/record/2634987Ordan, Julien MariusHRMT45 Installation in SPS Tunnel BA7PhotolabThe HRMT45 module undergoing the last checks during its installation at the HiRadMat TNC facility before getting ready to take beam. The fast connections at the bottom of the support table allow the power supply of the motors and the instrumentation as well as the communication with the acquisition system located in the shielded TT61 area. The water supply is also done via quick connectors, in order to obtain the necessary flow for cooling down the device during the experiment. Additionally, the tank must be connected to a primary vacuum pump to ensure a stable vacuum level at all times, especially upon high intensity beam shots when the graphite material inside the tank outgasses the most. The HRMT45 test was successfully completed on 25th August at 3:30 amCERN-PHOTO-201808-198oai:cds.cern.ch:26349872018
spellingShingle Photolab
Ordan, Julien Marius
HRMT45 Installation in SPS Tunnel BA7
title HRMT45 Installation in SPS Tunnel BA7
title_full HRMT45 Installation in SPS Tunnel BA7
title_fullStr HRMT45 Installation in SPS Tunnel BA7
title_full_unstemmed HRMT45 Installation in SPS Tunnel BA7
title_short HRMT45 Installation in SPS Tunnel BA7
title_sort hrmt45 installation in sps tunnel ba7
topic Photolab
url http://cds.cern.ch/record/2634987
work_keys_str_mv AT ordanjulienmarius hrmt45installationinspstunnelba7