Cargando…
HRMT45 Installation in SPS Tunnel BA7
The HRMT45 module undergoing the last checks during its installation at the HiRadMat TNC facility before getting ready to take beam. The fast connections at the bottom of the support table allow the power supply of the motors and the instrumentation as well as the communication with the acquisition...
Autor principal: | Ordan, Julien Marius |
---|---|
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2634987 |
Ejemplares similares
-
Coldbox installation for HL-LHC crab cavity test in the SPS tunnel (BA6)
por: Ordan, Julien Marius, et al.
Publicado: (2018) -
HRMT44 Preparation and Assembly in Metrology Lab
por: Ordan, Julien Marius, et al.
Publicado: (2018) -
CERN CRAB Cavitiy installation in the SPS tunnel
por: Brice, Maximilien, et al.
Publicado: (2018) -
YETS2018 - CRAB table installation in the SPS tunnel
por: Brice, Maximilien, et al.
Publicado: (2018) -
opening the HRMT-45 module by means of a robot
por: brice, Maximilien
Publicado: (2018)