Cargando…
Simulations and Measurements of X-Band Accelerating Structures of The CLIC Project
The Compact Linear Collider (CLIC) Project is 50 km long e−, e+ linear collider planned to be built in three stages with 3 TeV center-of-mass energy at its last stage. The CLIC accelerator includes around 140000 accelerating structures. The cost optimisation process is ongoing before the production...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2634994 |