Cargando…

Simulations and Measurements of X-Band Accelerating Structures of The CLIC Project

The Compact Linear Collider (CLIC) Project is 50 km long e−, e+ linear collider planned to be built in three stages with 3 TeV center-of-mass energy at its last stage. The CLIC accelerator includes around 140000 accelerating structures. The cost optimisation process is ongoing before the production...

Descripción completa

Detalles Bibliográficos
Autor principal: Bursali, Hikmet
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2634994

Ejemplares similares