Cargando…

BDF target prototype installation in TCC2

Transport of the prototype to TCC2. Remote installation with transport crane and robot in its support upstream the T6 target. The target is installed on a highly modified LHC collimator plugin table with high-pressure compatible water connections and electrical and optical fibres feedthroughs. The t...

Descripción completa

Detalles Bibliográficos
Autor principal: Ordan, Julien Marius
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2638991
Descripción
Sumario:Transport of the prototype to TCC2. Remote installation with transport crane and robot in its support upstream the T6 target. The target is installed on a highly modified LHC collimator plugin table with high-pressure compatible water connections and electrical and optical fibres feedthroughs. The target require fully remote compatibility due to the expected high dose rate after having received proton beam at 45 kW beam power.