Cargando…
BDF target prototype installation in TCC2
Transport of the prototype to TCC2. Remote installation with transport crane and robot in its support upstream the T6 target. The target is installed on a highly modified LHC collimator plugin table with high-pressure compatible water connections and electrical and optical fibres feedthroughs. The t...
Autor principal: | Ordan, Julien Marius |
---|---|
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2638991 |
Ejemplares similares
-
BDF target prototype assembly
por: Ordan, Julien Marius
Publicado: (2018) -
Installation of the third generation n_TOF spallation target in the target pit
por: Ordan, Julien Marius, et al.
Publicado: (2021) -
Installation of two goniometers in the LHC
por: Ordan, Julien Marius
Publicado: (2021) -
Installation of RWTC containment enclosure
por: Ordan, Julien Marius
Publicado: (2021) -
TDIS installation in the LHC tunnel at Point 2, near ALICE
por: Ordan, Julien Marius
Publicado: (2020)