Cargando…

CMS Drift Tubes readout Phase 1 upgrade

The CMS Drift Tubes (DT) readout system, responsible of the data acquisition of the time information from the muon DT chambers, has gone through an upgrade during the 2017-2018 short technical stop to overcome the limitations of event processing speed due to the increase of LHC luminosity during Pha...

Descripción completa

Detalles Bibliográficos
Autor principal: Navarro Tobar, Alvaro
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.343.0039
http://cds.cern.ch/record/2645757
_version_ 1780960451244326912
author Navarro Tobar, Alvaro
author_facet Navarro Tobar, Alvaro
author_sort Navarro Tobar, Alvaro
collection CERN
description The CMS Drift Tubes (DT) readout system, responsible of the data acquisition of the time information from the muon DT chambers, has gone through an upgrade during the 2017-2018 short technical stop to overcome the limitations of event processing speed due to the increase of LHC luminosity during Phase 1. A new higher performance uTCA based system (uROS board) has replaced the legacy VME based electronics (ROS-25 and DDU). The uROS system is built out of 3 utCA crates that host up to 25 boards, each board reading out 3 sectors from each CMS wheel (72 ROBs, located at chamber level). The uROS boards are built around a Virtex-7 FPGA and share the hardware with the TwinMux board, responsible of the DT upgraded trigger system, though the firmware has been built ad-hoc for the different requirements. Each uROS board deserializes up to 72 input links at 240 Mbps, with an innovative adaptative oversampling method. Event building and synchronization, data integrity monitoring and error stream correction whenever possible have been implemented, together with data transmission to the AMC13 board and further CMS DAQ chain. At present the uROS system is fully operational, taking collision data satisfactorily. The performance of the new system will be presented in this contribution.
id cern-2645757
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-26457572022-01-14T15:04:22Zdoi:10.22323/1.343.0039http://cds.cern.ch/record/2645757engNavarro Tobar, AlvaroCMS Drift Tubes readout Phase 1 upgradeDetectors and Experimental TechniquesThe CMS Drift Tubes (DT) readout system, responsible of the data acquisition of the time information from the muon DT chambers, has gone through an upgrade during the 2017-2018 short technical stop to overcome the limitations of event processing speed due to the increase of LHC luminosity during Phase 1. A new higher performance uTCA based system (uROS board) has replaced the legacy VME based electronics (ROS-25 and DDU). The uROS system is built out of 3 utCA crates that host up to 25 boards, each board reading out 3 sectors from each CMS wheel (72 ROBs, located at chamber level). The uROS boards are built around a Virtex-7 FPGA and share the hardware with the TwinMux board, responsible of the DT upgraded trigger system, though the firmware has been built ad-hoc for the different requirements. Each uROS board deserializes up to 72 input links at 240 Mbps, with an innovative adaptative oversampling method. Event building and synchronization, data integrity monitoring and error stream correction whenever possible have been implemented, together with data transmission to the AMC13 board and further CMS DAQ chain. At present the uROS system is fully operational, taking collision data satisfactorily. The performance of the new system will be presented in this contribution.CMS-CR-2018-298oai:cds.cern.ch:26457572018-10-19
spellingShingle Detectors and Experimental Techniques
Navarro Tobar, Alvaro
CMS Drift Tubes readout Phase 1 upgrade
title CMS Drift Tubes readout Phase 1 upgrade
title_full CMS Drift Tubes readout Phase 1 upgrade
title_fullStr CMS Drift Tubes readout Phase 1 upgrade
title_full_unstemmed CMS Drift Tubes readout Phase 1 upgrade
title_short CMS Drift Tubes readout Phase 1 upgrade
title_sort cms drift tubes readout phase 1 upgrade
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.22323/1.343.0039
http://cds.cern.ch/record/2645757
work_keys_str_mv AT navarrotobaralvaro cmsdrifttubesreadoutphase1upgrade