Cargando…

Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes

The Electronics for the Drift Tube Chambers (DT) of CMS will be significantly upgraded during the LHC Long Shutdown 3 (LS3). DTs are responsible for the tracking and triggering of muons in the central region of CMS. As a consequence of the higher L1A rate set by HL-LHC, the new CMS Trigger requireme...

Descripción completa

Detalles Bibliográficos
Autor principal: Triossi, Andrea
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2645761
_version_ 1780960452127227904
author Triossi, Andrea
author_facet Triossi, Andrea
author_sort Triossi, Andrea
collection CERN
description The Electronics for the Drift Tube Chambers (DT) of CMS will be significantly upgraded during the LHC Long Shutdown 3 (LS3). DTs are responsible for the tracking and triggering of muons in the central region of CMS. As a consequence of the higher L1A rate set by HL-LHC, the new CMS Trigger requirements will exceed the present capabilities of the DT on-detector electronics (so called MiniCrate, MiC). For this reason, having also in mind easier electronics maintainability and chamber aging mitigation arguments, DTs will replace all their MiCs during LS3. The phase-2 on detector electronics for DT will consist of a single type of board called OBDT (On Board electronics for Drift Tubes). A full description of the OBDT will be given along with the status of the prototype production and validation tests on the firmware.
id cern-2645761
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-26457612019-09-30T06:29:59Zhttp://cds.cern.ch/record/2645761engTriossi, AndreaElectronics Developments for Phase-2 Upgrade of CMS Drift TubesDetectors and Experimental TechniquesThe Electronics for the Drift Tube Chambers (DT) of CMS will be significantly upgraded during the LHC Long Shutdown 3 (LS3). DTs are responsible for the tracking and triggering of muons in the central region of CMS. As a consequence of the higher L1A rate set by HL-LHC, the new CMS Trigger requirements will exceed the present capabilities of the DT on-detector electronics (so called MiniCrate, MiC). For this reason, having also in mind easier electronics maintainability and chamber aging mitigation arguments, DTs will replace all their MiCs during LS3. The phase-2 on detector electronics for DT will consist of a single type of board called OBDT (On Board electronics for Drift Tubes). A full description of the OBDT will be given along with the status of the prototype production and validation tests on the firmware.CMS-CR-2018-315oai:cds.cern.ch:26457612018-10-26
spellingShingle Detectors and Experimental Techniques
Triossi, Andrea
Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title_full Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title_fullStr Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title_full_unstemmed Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title_short Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
title_sort electronics developments for phase-2 upgrade of cms drift tubes
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2645761
work_keys_str_mv AT triossiandrea electronicsdevelopmentsforphase2upgradeofcmsdrifttubes