Cargando…
Electronics Developments for Phase-2 Upgrade of CMS Drift Tubes
The Electronics for the Drift Tube Chambers (DT) of CMS will be significantly upgraded during the LHC Long Shutdown 3 (LS3). DTs are responsible for the tracking and triggering of muons in the central region of CMS. As a consequence of the higher L1A rate set by HL-LHC, the new CMS Trigger requireme...
Autor principal: | Triossi, Andrea |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2645761 |
Ejemplares similares
-
Phase 1 upgrade of the CMS Drift Tubes Read-Out system
por: Navarro Tobar, Alvaro, et al.
Publicado: (2016) -
CMS Drift Tubes readout Phase 1 upgrade
por: Navarro Tobar, Alvaro
Publicado: (2018) -
Upgrade of the Second Level of the Readout Electronics for the CMS Drift Tubes Subdetector
por: Navarro Tobar, Alvaro
Publicado: (2011) -
The Phase-2 upgrade of the CMS Drift Tube detectors for High Luminosity LHC
por: Sharma, Archie
Publicado: (2022) -
The optical links for the trigger upgrade of the Drift Tube in CMS
por: De Remigis, Paolo
Publicado: (2015)