Cargando…
opening the HRMT-45 module by means of a robot
Opening of the HRMT-45 module by means of a robot in bldg 867-R-P58. After having undergone several high intensity beam impacts at the HiRadMat facility in August, the TDIS HRMT-45 module starts to be disassembled by the EN/STI-TCD and EN/SMM-MRO teams in the bunker 867-R-P58 for the post-irradiatio...
Autor principal: | brice, Maximilien |
---|---|
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2646413 |
Ejemplares similares
-
HRMT-27 experiment move into TNC/HiRadMat tunnel
por: Brice, Maximilien
Publicado: (2015) -
HRMT45 Installation in SPS Tunnel BA7
por: Ordan, Julien Marius
Publicado: (2018) -
HRMT44 Preparation and Assembly in Metrology Lab
por: Ordan, Julien Marius, et al.
Publicado: (2018) -
MEDICIS robot isotope production for medical research
por: Brice, Maximilien
Publicado: (2017) -
New microcosm is open
por: Brice, Maximilien
Publicado: (2015)