Cargando…

Upgrade of the CMS muon spectrometer in the forward region with the GEM technology

The Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator l...

Descripción completa

Detalles Bibliográficos
Autor principal: Gruchala, Marek Michal
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.340.0132
http://cds.cern.ch/record/2647110
_version_ 1780960537659572224
author Gruchala, Marek Michal
author_facet Gruchala, Marek Michal
author_sort Gruchala, Marek Michal
collection CERN
description The Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator luminosity will be increased to 2 - 3 $\times$ 10$^{34}$cm$^{-2}$s$^{-1}$ exceeding the design value of 1 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$ allowing the CMS experiment to collect approximately 100 fb$^{-1}$/year. A subsequent upgrade in 2022-23 will increase the luminosity up to 5 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$. To cope with the corresponding increase in background rates and trigger efficiency requirements, the installation of additional muon detectors is a necessity. Three major upgrades are planned for the CMS muon endcap regions, referred as GE1/1, GE2/1 and ME0. Each of the additional set of detectors is based on the Gas Electron Multiplier (GEM) technology, a choice based on many past R\&D activities. While the installation of the GE1/1 chambers has been already approved and scheduled by 2019/20, the GE2/1 project is in an advanced phase of design and the ME0 project is now in the final phase of review. We present an overview of the muon spectrometer upgrade based on GEM technology, the details of the ongoing GE1/1 chamber production with the first results of the quality assurance tests. Moreover, preliminary results obtained for the GE2/1 single module M4 will be shown along with the design and the technical solution adopted for the foreseen GE2/1 and ME0 chambers.
id cern-2647110
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-26471102022-01-14T15:03:50Zdoi:10.22323/1.340.0132http://cds.cern.ch/record/2647110engGruchala, Marek MichalUpgrade of the CMS muon spectrometer in the forward region with the GEM technologyDetectors and Experimental TechniquesThe Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator luminosity will be increased to 2 - 3 $\times$ 10$^{34}$cm$^{-2}$s$^{-1}$ exceeding the design value of 1 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$ allowing the CMS experiment to collect approximately 100 fb$^{-1}$/year. A subsequent upgrade in 2022-23 will increase the luminosity up to 5 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$. To cope with the corresponding increase in background rates and trigger efficiency requirements, the installation of additional muon detectors is a necessity. Three major upgrades are planned for the CMS muon endcap regions, referred as GE1/1, GE2/1 and ME0. Each of the additional set of detectors is based on the Gas Electron Multiplier (GEM) technology, a choice based on many past R\&D activities. While the installation of the GE1/1 chambers has been already approved and scheduled by 2019/20, the GE2/1 project is in an advanced phase of design and the ME0 project is now in the final phase of review. We present an overview of the muon spectrometer upgrade based on GEM technology, the details of the ongoing GE1/1 chamber production with the first results of the quality assurance tests. Moreover, preliminary results obtained for the GE2/1 single module M4 will be shown along with the design and the technical solution adopted for the foreseen GE2/1 and ME0 chambers.CMS-CR-2018-325oai:cds.cern.ch:26471102018-10-30
spellingShingle Detectors and Experimental Techniques
Gruchala, Marek Michal
Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title_full Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title_fullStr Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title_full_unstemmed Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title_short Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
title_sort upgrade of the cms muon spectrometer in the forward region with the gem technology
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.22323/1.340.0132
http://cds.cern.ch/record/2647110
work_keys_str_mv AT gruchalamarekmichal upgradeofthecmsmuonspectrometerintheforwardregionwiththegemtechnology