Cargando…
Upgrade of the CMS muon spectrometer in the forward region with the GEM technology
The Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator l...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.340.0132 http://cds.cern.ch/record/2647110 |
_version_ | 1780960537659572224 |
---|---|
author | Gruchala, Marek Michal |
author_facet | Gruchala, Marek Michal |
author_sort | Gruchala, Marek Michal |
collection | CERN |
description | The Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator luminosity will be increased to 2 - 3 $\times$ 10$^{34}$cm$^{-2}$s$^{-1}$ exceeding the design value of 1 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$ allowing the CMS experiment to collect approximately 100 fb$^{-1}$/year. A subsequent upgrade in 2022-23 will increase the luminosity up to 5 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$. To cope with the corresponding increase in background rates and trigger efficiency requirements, the installation of additional muon detectors is a necessity. Three major upgrades are planned for the CMS muon endcap regions, referred as GE1/1, GE2/1 and ME0. Each of the additional set of detectors is based on the Gas Electron Multiplier (GEM) technology, a choice based on many past R\&D activities. While the installation of the GE1/1 chambers has been already approved and scheduled by 2019/20, the GE2/1 project is in an advanced phase of design and the ME0 project is now in the final phase of review. We present an overview of the muon spectrometer upgrade based on GEM technology, the details of the ongoing GE1/1 chamber production with the first results of the quality assurance tests. Moreover, preliminary results obtained for the GE2/1 single module M4 will be shown along with the design and the technical solution adopted for the foreseen GE2/1 and ME0 chambers. |
id | cern-2647110 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | cern-26471102022-01-14T15:03:50Zdoi:10.22323/1.340.0132http://cds.cern.ch/record/2647110engGruchala, Marek MichalUpgrade of the CMS muon spectrometer in the forward region with the GEM technologyDetectors and Experimental TechniquesThe Large Hadron Collider (LHC) will be upgraded in several phases that will allow the significant expansion of its physics program and the sustainability for the requirements to maintain sensitivity for the electroweak and TeV scales. After the expected long shutdown in 2018 (LS2) the accelerator luminosity will be increased to 2 - 3 $\times$ 10$^{34}$cm$^{-2}$s$^{-1}$ exceeding the design value of 1 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$ allowing the CMS experiment to collect approximately 100 fb$^{-1}$/year. A subsequent upgrade in 2022-23 will increase the luminosity up to 5 $\times$ $10^{34}$cm$^{-2}$s$^{-1}$. To cope with the corresponding increase in background rates and trigger efficiency requirements, the installation of additional muon detectors is a necessity. Three major upgrades are planned for the CMS muon endcap regions, referred as GE1/1, GE2/1 and ME0. Each of the additional set of detectors is based on the Gas Electron Multiplier (GEM) technology, a choice based on many past R\&D activities. While the installation of the GE1/1 chambers has been already approved and scheduled by 2019/20, the GE2/1 project is in an advanced phase of design and the ME0 project is now in the final phase of review. We present an overview of the muon spectrometer upgrade based on GEM technology, the details of the ongoing GE1/1 chamber production with the first results of the quality assurance tests. Moreover, preliminary results obtained for the GE2/1 single module M4 will be shown along with the design and the technical solution adopted for the foreseen GE2/1 and ME0 chambers.CMS-CR-2018-325oai:cds.cern.ch:26471102018-10-30 |
spellingShingle | Detectors and Experimental Techniques Gruchala, Marek Michal Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title | Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title_full | Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title_fullStr | Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title_full_unstemmed | Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title_short | Upgrade of the CMS muon spectrometer in the forward region with the GEM technology |
title_sort | upgrade of the cms muon spectrometer in the forward region with the gem technology |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.22323/1.340.0132 http://cds.cern.ch/record/2647110 |
work_keys_str_mv | AT gruchalamarekmichal upgradeofthecmsmuonspectrometerintheforwardregionwiththegemtechnology |