Cargando…
Staged implementation of low-impedance collimation in IR7: plans for LS2
The HL-LHC upgrade baseline foresees to replace all secondary collimators of IR7 until LS3 in order to ensure a sufficient margin for beam stability with the high-brightness upgraded beams. The present TCSG design is based on a carbon-fibre composite (CFC) material and will be replaced with a new lo...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2654779 |
_version_ | 1780961132240961536 |
---|---|
author | Redaelli, Stefano Antipov, Sergey Biancacci, Nicolo Bertarelli, Alessandro Bruce, Roderik Carra, Federico Gobbi, Giorgia Lechner, Anton Mereghetti, Alessio Metral, Elias |
author_facet | Redaelli, Stefano Antipov, Sergey Biancacci, Nicolo Bertarelli, Alessandro Bruce, Roderik Carra, Federico Gobbi, Giorgia Lechner, Anton Mereghetti, Alessio Metral, Elias |
author_sort | Redaelli, Stefano |
collection | CERN |
description | The HL-LHC upgrade baseline foresees to replace all secondary collimators of IR7 until LS3 in order to ensure a sufficient margin for beam stability with the high-brightness upgraded beams. The present TCSG design is based on a carbon-fibre composite (CFC) material and will be replaced with a new low-impedance design (TCSPM). The TCSPM design is based on a Molybdenum-Graphite (MoGr) composite material coated with pure Molybdenum. These collimators also embed in-jaw beam position monitors (BPMs) for a fast alignment and local orbit monitoring as well as an additional BPM for measurements of the orbit transverse to the collimation pane. A staged deployment strategy of the low-impedance upgrade is proposed that foresees to install 4 TCSPM collimators per beam in LS2 and the remaining 7 in LS3. In this note, the slots to be equipped with the TCSPM in LS2 are defined. |
id | cern-2654779 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | cern-26547792019-09-30T06:29:59Zhttp://cds.cern.ch/record/2654779engRedaelli, StefanoAntipov, SergeyBiancacci, NicoloBertarelli, AlessandroBruce, RoderikCarra, FedericoGobbi, GiorgiaLechner, AntonMereghetti, AlessioMetral, EliasStaged implementation of low-impedance collimation in IR7: plans for LS2Accelerators and Storage RingsThe HL-LHC upgrade baseline foresees to replace all secondary collimators of IR7 until LS3 in order to ensure a sufficient margin for beam stability with the high-brightness upgraded beams. The present TCSG design is based on a carbon-fibre composite (CFC) material and will be replaced with a new low-impedance design (TCSPM). The TCSPM design is based on a Molybdenum-Graphite (MoGr) composite material coated with pure Molybdenum. These collimators also embed in-jaw beam position monitors (BPMs) for a fast alignment and local orbit monitoring as well as an additional BPM for measurements of the orbit transverse to the collimation pane. A staged deployment strategy of the low-impedance upgrade is proposed that foresees to install 4 TCSPM collimators per beam in LS2 and the remaining 7 in LS3. In this note, the slots to be equipped with the TCSPM in LS2 are defined. CERN-ACC-NOTE-2019-0001oai:cds.cern.ch:26547792019-01-24 |
spellingShingle | Accelerators and Storage Rings Redaelli, Stefano Antipov, Sergey Biancacci, Nicolo Bertarelli, Alessandro Bruce, Roderik Carra, Federico Gobbi, Giorgia Lechner, Anton Mereghetti, Alessio Metral, Elias Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title | Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title_full | Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title_fullStr | Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title_full_unstemmed | Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title_short | Staged implementation of low-impedance collimation in IR7: plans for LS2 |
title_sort | staged implementation of low-impedance collimation in ir7: plans for ls2 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2654779 |
work_keys_str_mv | AT redaellistefano stagedimplementationoflowimpedancecollimationinir7plansforls2 AT antipovsergey stagedimplementationoflowimpedancecollimationinir7plansforls2 AT biancaccinicolo stagedimplementationoflowimpedancecollimationinir7plansforls2 AT bertarellialessandro stagedimplementationoflowimpedancecollimationinir7plansforls2 AT bruceroderik stagedimplementationoflowimpedancecollimationinir7plansforls2 AT carrafederico stagedimplementationoflowimpedancecollimationinir7plansforls2 AT gobbigiorgia stagedimplementationoflowimpedancecollimationinir7plansforls2 AT lechneranton stagedimplementationoflowimpedancecollimationinir7plansforls2 AT mereghettialessio stagedimplementationoflowimpedancecollimationinir7plansforls2 AT metralelias stagedimplementationoflowimpedancecollimationinir7plansforls2 |