Cargando…

SPS RF accelerating cavities removed from the tunnel of the accelerator

The four accelerating RF cavities of the SPS are removed from their tunnel to be upgraded during the Long shutdown 2 (LS2).

Detalles Bibliográficos
Autor principal: Brice, Maximilien
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2658182
_version_ 1780961225002188800
author Brice, Maximilien
author_facet Brice, Maximilien
author_sort Brice, Maximilien
collection CERN
description The four accelerating RF cavities of the SPS are removed from their tunnel to be upgraded during the Long shutdown 2 (LS2).
id cern-2658182
institution Organización Europea para la Investigación Nuclear
publishDate 2019
record_format invenio
spelling cern-26581822019-09-30T06:29:59Zhttp://cds.cern.ch/record/2658182Brice, MaximilienSPS RF accelerating cavities removed from the tunnel of the acceleratorPhotolabThe four accelerating RF cavities of the SPS are removed from their tunnel to be upgraded during the Long shutdown 2 (LS2).CERN-PHOTO-201902-032oai:cds.cern.ch:26581822019
spellingShingle Photolab
Brice, Maximilien
SPS RF accelerating cavities removed from the tunnel of the accelerator
title SPS RF accelerating cavities removed from the tunnel of the accelerator
title_full SPS RF accelerating cavities removed from the tunnel of the accelerator
title_fullStr SPS RF accelerating cavities removed from the tunnel of the accelerator
title_full_unstemmed SPS RF accelerating cavities removed from the tunnel of the accelerator
title_short SPS RF accelerating cavities removed from the tunnel of the accelerator
title_sort sps rf accelerating cavities removed from the tunnel of the accelerator
topic Photolab
url http://cds.cern.ch/record/2658182
work_keys_str_mv AT bricemaximilien spsrfacceleratingcavitiesremovedfromthetunneloftheaccelerator