Cargando…
Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade
High Density Interconnect (HDI) hybrids are being developed for the CMS Tracker Phase Two Upgrade for the HL-LHC. These hybrids are carbon fibre reinforced flexible circuits with flip-chips, passives and connectors. Their operational lifetime is determined by the reliability of the solder joints of...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.343.0146 http://cds.cern.ch/record/2658202 |
_version_ | 1780961226513186816 |
---|---|
author | Kovacs, Mark Istvan Bruno Allongue Florian Andre Blanchot, Georges Gadek, Tomasz Gajanec, Rafael |
author_facet | Kovacs, Mark Istvan Bruno Allongue Florian Andre Blanchot, Georges Gadek, Tomasz Gajanec, Rafael |
author_sort | Kovacs, Mark Istvan |
collection | CERN |
description | High Density Interconnect (HDI) hybrids are being developed for the CMS Tracker Phase Two Upgrade for the HL-LHC. These hybrids are carbon fibre reinforced flexible circuits with flip-chips, passives and connectors. Their operational lifetime is determined by the reliability of the solder joints of the surface mount components (flip-chips, passives, connectors) and the copper traces and vias in the hybrid substrate. Specific test coupons were exposed to accelerated thermal stress cycles, aiming to test the reliability of the solder joints, vias and traces. Results from different suppliers and technologies will be evaluated and compared. |
id | cern-2658202 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | cern-26582022022-01-14T15:04:44Zdoi:10.22323/1.343.0146http://cds.cern.ch/record/2658202engKovacs, Mark IstvanBruno AllongueFlorian AndreBlanchot, GeorgesGadek, TomaszGajanec, RafaelReliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker UpgradeDetectors and Experimental TechniquesHigh Density Interconnect (HDI) hybrids are being developed for the CMS Tracker Phase Two Upgrade for the HL-LHC. These hybrids are carbon fibre reinforced flexible circuits with flip-chips, passives and connectors. Their operational lifetime is determined by the reliability of the solder joints of the surface mount components (flip-chips, passives, connectors) and the copper traces and vias in the hybrid substrate. Specific test coupons were exposed to accelerated thermal stress cycles, aiming to test the reliability of the solder joints, vias and traces. Results from different suppliers and technologies will be evaluated and compared.CMS-CR-2018-292oai:cds.cern.ch:26582022018-10-18 |
spellingShingle | Detectors and Experimental Techniques Kovacs, Mark Istvan Bruno Allongue Florian Andre Blanchot, Georges Gadek, Tomasz Gajanec, Rafael Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title | Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title_full | Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title_fullStr | Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title_full_unstemmed | Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title_short | Reliability test results of the interconnect structures of the front-end hybrids for the CMS Phase-2 Tracker Upgrade |
title_sort | reliability test results of the interconnect structures of the front-end hybrids for the cms phase-2 tracker upgrade |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.22323/1.343.0146 http://cds.cern.ch/record/2658202 |
work_keys_str_mv | AT kovacsmarkistvan reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade AT brunoallongue reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade AT florianandre reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade AT blanchotgeorges reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade AT gadektomasz reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade AT gajanecrafael reliabilitytestresultsoftheinterconnectstructuresofthefrontendhybridsforthecmsphase2trackerupgrade |