Cargando…
ALICE TPC lifting to surface during LS2
ALICE TPC lifting to surface
Autor principal: | Ordan, Julien |
---|---|
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2665366 |
Ejemplares similares
-
ALICE Detector overview during LS2
por: Brice, Maximilien, et al.
Publicado: (2019) -
ALICE empty structure after modules removal, during LS2
por: Ordan, Julien
Publicado: (2019) -
Lowering and insertion of the ALICE TPC
por: Brice, Maximilien, et al.
Publicado: (2020) -
ALICE TRD Module 6 Extraction LS2 2018
por: Brice, Maximilien, et al.
Publicado: (2018) -
PS Magnets consolidation during LS2
por: Ordan, Julien Marius, et al.
Publicado: (2019)