Operation and Configuration of the LHC in Run 2

Between 2015 and 2018 the LHC was operated with protons at beam energies of 6.5 TeV with an integrated production of 160 fb-1 both ATLAS and CMS in proton operation. The peak proton performance exceeded twice the design luminosity thanks to very small transverse beam emittances and beta* of 30 cm. T...

Descripción completa

Detalles Bibliográficos
Autor principal: Wenninger, Jorg
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2668326
_version_ 1780962163141115904
author Wenninger, Jorg
author_facet Wenninger, Jorg
author_sort Wenninger, Jorg
collection CERN
description Between 2015 and 2018 the LHC was operated with protons at beam energies of 6.5 TeV with an integrated production of 160 fb-1 both ATLAS and CMS in proton operation. The peak proton performance exceeded twice the design luminosity thanks to very small transverse beam emittances and beta* of 30 cm. The nominal bunch spacing of 25 ns was used for high intensity operation, initially with the standard 25 ns beam and from 2016 onwards with BCMS and 8b4e beams. New features such as combined ramp and squeeze, crossing angle and levelling as well as ATS optics (Achromatic Telescopic Squeeze) were introduced in regular operation between 2016 and 2018. Lead ion, mixed proton-lead, intermediate proton energy, vdm calibration and high-beta runs were also performed with a large diversity of configurations and beam energies. This note summarizes LHC operation during Run 2 and documents in detail the congurations and performances achieved for the various operation modes.
id cern-2668326
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-26683262019-09-30T06:29:59Zhttp://cds.cern.ch/record/2668326engWenninger, JorgOperation and Configuration of the LHC in Run 2Accelerators and Storage RingsBetween 2015 and 2018 the LHC was operated with protons at beam energies of 6.5 TeV with an integrated production of 160 fb-1 both ATLAS and CMS in proton operation. The peak proton performance exceeded twice the design luminosity thanks to very small transverse beam emittances and beta* of 30 cm. The nominal bunch spacing of 25 ns was used for high intensity operation, initially with the standard 25 ns beam and from 2016 onwards with BCMS and 8b4e beams. New features such as combined ramp and squeeze, crossing angle and levelling as well as ATS optics (Achromatic Telescopic Squeeze) were introduced in regular operation between 2016 and 2018. Lead ion, mixed proton-lead, intermediate proton energy, vdm calibration and high-beta runs were also performed with a large diversity of configurations and beam energies. This note summarizes LHC operation during Run 2 and documents in detail the congurations and performances achieved for the various operation modes.CERN-ACC-NOTE-2019-0007oai:cds.cern.ch:26683262019-03-20
spellingShingle Accelerators and Storage Rings
Wenninger, Jorg
Operation and Configuration of the LHC in Run 2
title Operation and Configuration of the LHC in Run 2
title_full Operation and Configuration of the LHC in Run 2
title_fullStr Operation and Configuration of the LHC in Run 2
title_full_unstemmed Operation and Configuration of the LHC in Run 2
title_short Operation and Configuration of the LHC in Run 2
title_sort operation and configuration of the lhc in run 2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2668326
work_keys_str_mv AT wenningerjorg operationandconfigurationofthelhcinrun2