ProtoDUNE Double Phase 2019 status report

An enormous progress has been achieved and the installation of all components and sub-systems has been practically completed. The closure of the cryostat Temporary Construction Opening (TCO) is then expected to happen at the end of April 2019. The charged particles beam-line was also commissioned in...

Descripción completa

Detalles Bibliográficos
Autores principales: Autiero, D, Gil Botella, I, Duchesneau, D, Mazzucato, E, Resnati, F, Nessi, M
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2669311
_version_ 1780962203655995392
author Autiero, D
Gil Botella, I
Duchesneau, D
Mazzucato, E
Resnati, F
Nessi, M
author_facet Autiero, D
Gil Botella, I
Duchesneau, D
Mazzucato, E
Resnati, F
Nessi, M
author_sort Autiero, D
collection CERN
description An enormous progress has been achieved and the installation of all components and sub-systems has been practically completed. The closure of the cryostat Temporary Construction Opening (TCO) is then expected to happen at the end of April 2019. The charged particles beam-line was also commissioned in 2018. The collaboration is looking forward to the post-LS2 activities which were discussed at the SPSC of January 2019 on the basis of a common DUNE proposal for the two ProtoDUNEs. The collaboration is now eagerly awaiting for the filling of the detector and the start of its operation in summer 2019.
id cern-2669311
institution Organización Europea para la Investigación Nuclear
publishDate 2019
record_format invenio
spelling cern-26693112019-11-22T10:09:13Zhttp://cds.cern.ch/record/2669311Autiero, DGil Botella, IDuchesneau, DMazzucato, EResnati, FNessi, MProtoDUNE Double Phase 2019 status reportDetectors and Experimental TechniquesAn enormous progress has been achieved and the installation of all components and sub-systems has been practically completed. The closure of the cryostat Temporary Construction Opening (TCO) is then expected to happen at the end of April 2019. The charged particles beam-line was also commissioned in 2018. The collaboration is looking forward to the post-LS2 activities which were discussed at the SPSC of January 2019 on the basis of a common DUNE proposal for the two ProtoDUNEs. The collaboration is now eagerly awaiting for the filling of the detector and the start of its operation in summer 2019.CERN-SPSC-2019-014SPSC-SR-251oai:cds.cern.ch:26693112019-03-28
spellingShingle Detectors and Experimental Techniques
Autiero, D
Gil Botella, I
Duchesneau, D
Mazzucato, E
Resnati, F
Nessi, M
ProtoDUNE Double Phase 2019 status report
title ProtoDUNE Double Phase 2019 status report
title_full ProtoDUNE Double Phase 2019 status report
title_fullStr ProtoDUNE Double Phase 2019 status report
title_full_unstemmed ProtoDUNE Double Phase 2019 status report
title_short ProtoDUNE Double Phase 2019 status report
title_sort protodune double phase 2019 status report
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2669311
work_keys_str_mv AT autierod protodunedoublephase2019statusreport
AT gilbotellai protodunedoublephase2019statusreport
AT duchesneaud protodunedoublephase2019statusreport
AT mazzucatoe protodunedoublephase2019statusreport
AT resnatif protodunedoublephase2019statusreport
AT nessim protodunedoublephase2019statusreport