Cargando…

DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU

At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devic- es upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in t...

Descripción completa

Detalles Bibliográficos
Autor principal: Balhan, Bruno
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2674199
_version_ 1780962563029204992
author Balhan, Bruno
author_facet Balhan, Bruno
author_sort Balhan, Bruno
collection CERN
description At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devic- es upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the past, but the definitive approach for the equipment protection upgrade for each channel has now been determined. This paper describes the consequences of the most significant failure scenarios and the impact of the heat deposition in the diluter. The resulting material stresses are evaluated. The detailed layout for the extraction protection equipment for each extraction channel is outlined. The final layout consists of a extended diluter in Long Straight Section (LSS) 6 (TPSG6) and the installation of an additional mov- able absorber (TPSC4) upstream of the quadrupole in front of the existing protection equipment in LSS 4. The detailed mechanical design of the TPSC4 and the construction status of both TPSC4 and TPSG6 are discussed.
id cern-2674199
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-26741992019-09-30T06:29:59Zhttp://cds.cern.ch/record/2674199engBalhan, BrunoDESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIUAt CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devic- es upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the past, but the definitive approach for the equipment protection upgrade for each channel has now been determined. This paper describes the consequences of the most significant failure scenarios and the impact of the heat deposition in the diluter. The resulting material stresses are evaluated. The detailed layout for the extraction protection equipment for each extraction channel is outlined. The final layout consists of a extended diluter in Long Straight Section (LSS) 6 (TPSG6) and the installation of an additional mov- able absorber (TPSC4) upstream of the quadrupole in front of the existing protection equipment in LSS 4. The detailed mechanical design of the TPSC4 and the construction status of both TPSC4 and TPSG6 are discussed.Poster-2019-689oai:cds.cern.ch:26741992019-05-13
spellingShingle Balhan, Bruno
DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title_full DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title_fullStr DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title_full_unstemmed DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title_short DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
title_sort design and construction of the cern sps extraction protection elements for liu
url http://cds.cern.ch/record/2674199
work_keys_str_mv AT balhanbruno designandconstructionofthecernspsextractionprotectionelementsforliu