Cargando…
DESIGN AND CONSTRUCTION OF THE CERN SPS EXTRACTION PROTECTION ELEMENTS FOR LIU
At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devic- es upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in t...
Autor principal: | Balhan, Bruno |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2674199 |
Ejemplares similares
-
Design and construction of the CERN SPS extraction protection elements for LIU
por: Balhan, Bruno, et al.
Publicado: (2019) -
Upgrade of the CERN SPS Extraction Protection Elements TPS
por: Borburgh, Jan, et al.
Publicado: (2017) -
The Septum Magnet System of the New Fast Extraction Channel of the SPS at CERN
por: Balhan, B, et al.
Publicado: (2003) -
The LIU project and challenges in PSB, PS and SPS
por: Gilardoni, Simone
Publicado: (2013) -
IMPROVEMENT OF THE CERN SPS ELECTROSTATIC SEPTA ION TRAPS
por: Balhan, Bruno, et al.
Publicado: (2016)