Cargando…
ALICE central beryllium chamber
ALICE central beryllium chamber will undergo final processing phase. During this one will be coated by non-evaporable getter coating in lab.181. Chamber will be installed on a special lifting frame and inserted vertically using the crane into the sputtering setup (under the supervision of Antonios S...
Autor principal: | Hertzog, Samuel Joseph |
---|---|
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2682663 |
Ejemplares similares
-
Working on the ALICE Inner Tracking System (ITS)
por: Hertzog, Samuel Joseph
Publicado: (2020) -
View of the ALICE detector with its magnet doors closed
por: Hertzog, Samuel Joseph
Publicado: (2021) -
ALICE Time Projection Chamber (TPC)
por: Brice, Maximilien
Publicado: (2020) -
Dominic Walliman CERN visit
por: Hertzog, Samuel Joseph
Publicado: (2019) -
LHC Tunnel PT1 Interconnexions
por: Hertzog, Samuel Joseph
Publicado: (2019)